SEARCH

Found 6281 related files. Current in page 1

tips untuk drift kereta control

Suzuki Hayabusa 2000 - 2005
by nkono 0 Comments favorite 3 Viewed Download 0 Times

Suzuki Hayabusa 2000 - 2005 Engine Protection Cage installation instructions Items included in this kit Cage loop (1each) Side struts (2 each) Extended frame sliders (2 each) Hardware kit (1 each) (contents listed below) M10-1.25 x 70mm bolt (1 each) M10-1.25 x 80mm bolt (1 each) ¼”-20 x 1 ½” bolts (2 each) ¼”-20 x 2” bolts (2 each) ¼”-20 lock nuts (4 each) 3/8”-24 x ¾” bolts (2 each) Flange Bushings (2 each) M10-1.5 x 15 1/2" all thread rod (1 each) M10-1.5 hex nuts (2 each) 1. Follow installation instructions for extended frame sliders. (See page 1) Note: Do not attach delron tips or tighten extended frame sliders until all components are installed. 2. Place the cage loop inside short telescoping tubes on sliders (See fig. G), push the ¼”-20 x 1 ½” bolts through the bolt holes in the telescoping tubes from the outside and start the ¼”-20 lock nuts. Do not tighten lock nuts at this time. 3. Install the left side strut using the all thread rod, flange bushings and hex nuts provided. Slide the following components over one end of the all thread rod in this order: flange bushing marked with "L", side strut marked with "L" and one M10-1.5 hex nut. (See fig A) Slide the all thread rod through the swing arm bolt on the left side of the motorcycle. (make sure the flange bushing slides into the swing arm bolt) On the right side of the motorcycle slide the following components over the all thread rod in this order: flange bushing marked "R", side strut marked "R" and M10-1.5 hex nut. (you may need to hold the left side to ensure it stays in place) 4. Push the bottom of the cage loop towards the rear of the motorcycle while pulling the bottom of the left side strut towards the front until the bolt hole on the side strut meets the threaded hole on the tab welded to the cage loop. Attach the side strut to the outside of the tab on the cage loop with a 3/8”-24 x ¾” bolt. (See fig J) Do not tighten the bolt at this time. Repeat for other side. 5. Once all components are attached tighten all bolts and nuts. Be sure to torque all engine mount bolts to factory specifications. Torque the hex nuts on the all thread stud to 12ft lbs. We recommend using "blue" loctite on the all thread stud to ensure the hex nuts do not vibrate loose. 6. Install delron tips with ¼”-20 x 2” bolts and ¼”-20 lock nuts.

2009 Hayabusa - PCV - MPS Racing
by nkono 0 Comments favorite 4 Viewed Download 0 Times

Parts List Power Commander USB Cable CD-ROM Installation Guide Power Commander Decals Dynojet Decals Velcro® Strip Alcohol Swab Wire tap O2 eliminator The ignition MUST be turned OFF before installation! YOU CAN ALSO DOWNLOAD THE POWER COMMANDER SOFTWARE AND LATEST MAPS FROM OUR WEB SITE AT: WWW.POWERCOMMANDER.COM PLEASE READ ALL DIRECTIONS BEFORE STARTING INSTALLATION 2191 Mendenhall Drive 20-008 www.powercommander.com North Las Vegas, NV 89081 (800) 992-4993 www.powercommander.com 2009 Suzuki Hayabusa PCV - 1 POWER COMMANDER V INPUT ACCESSORY GUIDE A C C E S S O RY I N P U T S Map - The PCV has the ability to hold 2 different base maps. You can switch on the fly between these two base maps when you hook up a switch to the MAP inputs. You can use any open/close type switch. The polarity of the wires is not important. When using the Autotune kit one position will hold a base map and the other position will let you activate the learning mode. When the switch is “CLOSED” Autotune will be activated. Shifter- These inputs are for use with the Dynojet quickshifter. Insert the wires from the Dynojet quickshifter into the SHIFTER inputs. The polarity of the wires is not important. Speed- If your application has a speed sensor then you can tap into the signal side of the sensor and run a wire into this input. This will allow you to calculate gear position in the Control Center Software. Once gear position is setup you can alter your map based on gear position and setup gear dependent kill times when using a quickshifter. USB CONNECTION CRANK ANALOG EXPANSION PORTS 1 & 2 Optional Accessories such as Color LCD unit or Auto tune kit.

RCC Turbos - Stage 1 Turbo Install - Suzuki Hayabusa - Gen 1

RCC Turbos - Stage 1 Turbo Install: Suzuki Hayabusa (Gen 1) • Preparation/Disassembly: Remove the seat. Disconnect negative terminal on the battery. Drain the fuel tank. Remove the fuel tank. Remove the stock fuel pump from the tank. Remove the air box. Remove the MAP sensor and temperature sensor from the air box. Remove left and right side fairings. Drain engine oil. Drain engine coolant. Remove the oil filter Remove the oil restrictor, behind the filter. Remove the oil cooler lines. Remove the radiator and oil cooler, as one unit, leaving only the bracket/support for radiator (before reinstalling the radiator please remove all the tabs along the bottom of the radiator). Remove the entire exhaust system. Remove the PAIR system. Remove the oil pan from the engine. • Sensor Bracket Modification: On the left hand side of bike, on the inside of the frame, you will see a bracket, with a plastic vacuum canister, vacuum control solenoid valve, atmospheric pressure sensor, and some vacuum lines, with a check valve in the vacuum line. Please remove this entire bracket, eliminate all the vacuum lines, the plastic canister, and the control solenoid valve, and also cut off the metal tab that held the vacuum canister. Then reinstall this bracket with only the atmospheric pressure sensor, and plug the wires back in. • Tap/plug PAIR System Holes: Tap the four small PAIR system holes, above the exhaust ports, with an M6 x 1.0 tap. Install the four small M6 screws into the exhaust holes after tapping them. • Modify the Oil Pan: Drill a ¾” hole on the left side of the oil pan. Use thread sealant on the washer, and red Loctite on the threads. Make sure the sealing washer is against the inside of pan, then the stainless flat washer, then the nut. Once the fitting is installed, reinstall the oil pan. • Install Header/Turbo/Oil Lines/Exhaust: Install the header and turbo as a unit, but with the bolts loose. Use four of your original header bolts on the top of the turbo header (Allen head). Use the four new bolts on the bottom row of the header (M8, 10mm flange head). PLEASE NOTE! After installing the dump pipes and waste gate, the nipple on the top of the waste gate remains open, and no hose gets installed on the top fitting. The top fitting is used for boost control on Stage 2 and higher end kits. It is not used on Stage 1 kits.

YOUR NAME - Boston College
by Deppony 0 Comments favorite 3 Viewed Download 0 Times

YOUR NAME yourname@bc.edu (no hyperlink/line), 617-656-0000 Your Boston College address here, Chestnut Hill, MA 02467 Your home address here, Any Town, CA 01000 EDUCATION Boston College Chestnut Hill, MA College of Arts and Sciences (optional full, formal name of school you are in) Bachelor of Arts /Science in Major Minor (if you have one) anticipated May 200x GPA 3.xx (incl. GPA if > 3.00, do NOT round up) Honors/Awards: Dean’s List, Golden Key, AHANA Honor Roll Relevant courses (optional) (if applicable - no more than 4-5 upper level classes ) Abroad University, City, Country Studied (courses/subjects included) Spring Semester, 200x EXPERIENCE Name of Organization City, State Start date - end date Job title • Describe any accomplishments that you achieved at your job • Explain what you did, how you did it, why you did it, and what the results were • Whenever possible, quantify the number of people/items/data that you worked with ( Use present tense for verbs describing jobs that you are currently performing) Name of Organization City, State Start date - end date Job title • Describing Accomplishments: Result + Action + Problem/Project = good bullet point • Sample vague bullet point: Assisted with general upkeep and organization of homeless shelter • Sample good bullet points: Prepared and served meals to 50 homeless male residents; Maintained organization of supply closet and distributed resources to residents as needed; Acted as a liaison between program participants and staff members. VOLUNTEER EXPERIENCE and/or ACTIVITIES Name of first Organization City, State Start date - end date Title • Focus on a few key skills that your industry is looking for, and demonstrate how you used those skills through the description of the tasks/projects you accomplished at your job. Name of second Organization (brief description if necessary) City, State Start Date - end date Title • Remember to be consistent; punctuation at the end of the phrases is not necessary unless you are using paragraph formatting ACTIVITIES Section: List each organization (add an action verb phrase describing an acquired skill if you have space) SKILLS Computers: Microsoft Excel, PowerPoint, Word, and any other relevant computer skills or languages Language: List all languages you are fluent or proficient in or currently studying, if listed as fluent, should be able to conduct interview in that language. The resume samples included in this packet should be used as a starting point for visual models and general guidelines. Be sure to view all of the samples below for various styles/formats and resume tips. Please note that a small number of examples are show below. Each student is encouraged to construct a resume that fits his/her need.

BP Holdings - Kleine bedrijven belasting tips: uw documenten krijgen in een rij

Als de eigenaar van een bedrijf weet u dat er ook een het hele jaar door regime van goede verslaggeving kan maken indienen van nauwkeurige belastingaangifte gemakkelijker. En toch, we vaak achterblijven aan onze beste bedoelingen.

BP Holdings: 4 Tax Tips uw Accountant zal nooit vertellen u

Ik heb een hoge waardering voor accountants. Ze hebben een zeer moeilijke taak. Om te maximaliseren fiscale besparingen voor hun klanten, die ze nodig hebben om te begrijpen en interpreteren van een ongelooflijk ingewikkelde Internal Revenue Code. Voormalige Amerikaanse Congreslid John Hostettler zei eens: "de Internal Revenue Code en verordeningen tot 1 miljoen woorden toevoegen en is bijna zeven keer de lengte van de Bijbel."

Details and Tips for Choosing the Perfect Cannabis Seeds

With the elimination of natural habitats and genetic contamination in many parts of the worlds, which is prohibited the use and research of these Cannabis seeds pure strains is slowing being eroded from the planet.

Top 10 Tips for Finding Best SEO Service Provider

An online search using any of the search engines will reveal thousands of SEO Service Providers and experts – many of them self-styled with zero knowledge and experience. How then does one separate the men from the boys? Here are 10 tips to help you find the best SEO Service Provider. Look for the client list – an SEO service provider with no client list is one who has no experience.

B&W print solutions for maximum power in minimum space

http://www.kmsa.com/Home/Products%20and%20Services | The bizhub 4700P, 4000P and 3300P from Konica Minolta are more than just ordinary printers. Quick B&W print speed and simple control panels make these printing machines perfect for fast paced office environments. Designed with the environment in mind, these printers also come with a special Eco-mode and Auto Duplexing to reduce power consumption and save paper. Whether you use a Windows or Mac computer, you can enjoy the full benefits of Konica Minolta’s bizhub printers.

Finding a good SEO partner
by altheaborromeo 0 Comments favorite 1 Viewed Download 0 Times

Forbes.com contributor Joshua Steimle wrote an excellent article, 4 Tips For Hiring The Right SEO Firm, that might help those in need of this service cut through the fog that shrouds the overly crowded SEO industry. It is, perhaps, the ultimate irony that anyone searching the Internet for a company that can help them become more visible on the Internet, can easily experience confusion and information overload.

« previous  123456789