SEARCH

Found 1418 related files. Current in page 1

sample authorization letter in bahasa malaysia

FINAL Deep Dive Report (S10-140310-003)[1] - Federal Railroad ...

On May 17, 2013, in Bridgeport, Connecticut, an accident occurred on Metro-North’s New Haven Line, when an eastbound Metro-North train of 8 cars, traveling 74 mph, derailed and came to rest on an adjacent track. Approximately 20 seconds later, a westbound Metro-North train on that adjacent track struck the derailed train. As a result of the accident, more than 50 people, some seriously injured, were hospitalized, rail operations were suspended, and millions in property damage occurred. • On May 28, 2013, a second accident occurred when a Metro-North train in West Haven, Connecticut, that was traveling 70 mph, struck and killed a Metro-North maintenance-ofway (MOW) employee who was part of a roadway work group performing railroad maintenance on a construction project. • On July 18, 2013, a third accident occurred when a CSX Transportation freight train derailed while traveling over Metro-North’s system. No one was injured, but property damage was significant. • On December 1, 2013, the fourth accident occurred when a Metro-North train of 7 cars traveling south from Poughkeepsie, New York, to Grand Central Terminal in New York City, derailed as it approached the Spuyten Duyvil Station. All cars derailed and the front cab came to rest close to the Harlem River. Four passengers were killed, and more than 70 were injured. Rail operations were suspended, and millions of dollars in property damage alone was sustained. On December 3, 2013, 2 days after the fourth and most serious of these accidents, FRA sent a letter to MTA expressing support for Governor Andrew Cuomo’s directive that MTA hold a safety stand-down, and directing Metro-North to implement a Confidential Close Call Reporting System (C3RS) (Appendix 2). Additionally, FRA issued Emergency Order 29 and Safety Advisory 2013-08. • Emergency Order 29, issued on December 6, 2013, required Metro-North to take immediate action to prevent excessive train speeds by identifying and prioritizing highrisk areas, modifying its existing signal system to ensure speed limits are obeyed, and 1 requiring a higher level of engagement and communication among operating crewmembers in areas in which major speed restrictions are in place. • Safety Advisory 2013-08, issued on December 10, 2013, urged railroads to provide additional training, increase the frequency of operational testing, and reinforced the importance of communication between crew members. The purpose was to ensure that all railroads adhere to Federal regulations and railroad operating rules regarding maximum authorized train speed limits. On December 16, 2013, FRA launched Operation Deep Dive, an assessment of Metro-North’s operations and safety compliance. More than 60 technical and human factor experts comprising 14 teams, conducted a 60-day comprehensive safety assessment of Metro-North. With assistance from the Federal Transit Administration, these experts reviewed and assessed Metro-North’s safety-related processes and procedures, its compliance with safety regulations and requirements, and its overall safety culture. In assessing Metro-North, the Deep Dive team evaluated:...

SMNPTN IPS 2013
by top markotop 0 Comments favorite 2 Viewed Download 0 Times

KATA PENGANTAR Puji syukur kehadirat Tuhan Yang Maha Esa, Allah SWT yang selalu melimpahkan rahmat-Nya kepada kita semua. Alhamdulillah tim penyusun telah berhasil menyelesaikan penyusunan pembahasan SBMPTN, walaupun buku ini masih jauh dari kesempurnaan. di SBMPTN (d/h SNMPTN) sehingga soal yang akan keluar di tahun berikutnya dapat diprediksi maka dengan panduan buku ini diharapkan siswa lebih siap menghadapi ujian masuk PTN. SBMPTN merupakan kegiatan seleksi ujian masuk PTN dengan tipe soal, yaitu TPA (Tes Po- Buku ini dirancang dalam upaya untuk menunjang pelajaran sekolah dalam bidang studi IPA sebagai kiat sukses menembus PTN. Setelah memahami konsep materi maka perlu melatih diri dengan soal-soal latihan. Buku ini memuat kumpulan soal dan pembahasan soal–soal SNMPTN mulai dari tahun 2008 sampai tahun 2012. Penyelesaian soal dibahas dengan pembahasan sederhana, praktis, pendekatan konseptual, dan sistematis. Dengan latihan soal akan membantu siswa memahami karakteristik tren soal-soal yang sering keluar tensial Akademik), Kemampuan Dasar (Matematika Dasar, Bahasa Indonesia, dan Bahasa Inggris) serta Kemampuan IPA (Matematika, Fisika, Kimia, dan Biologi) atau kemampuan IPS (Ekonomi, Sejarah, Geografi, dan Sosiologi). Buku ini hadir untuk kelas 3 SMA/MA/SMK yang ingin melanjutkan studi ke PTN. Tim Penyusun sangat paham bahwa buku ini masih banyak kekurangan. Oleh karena itu, mohon kritikan dan saran demi perbaikan buku ini.

SMART SOLUTION Tes Potensi Akademik SBMPTN 2013

Rangkuman Materi SBMPTN 2013 SELEKSI BERSAMA MASUK PERGURUAN TINGGI NEGERI Disertai Teori Ringkas dan Pembahasan Soal Tes Potensi Akademik (TPA) Disusun Oleh : Pak Anang Kumpulan SMART SOLUTION dan TRIK SUPERKILAT Ringkasan Materi SBMPTN Tes Potensi Akademik (TPA) Penalaran Verbal (Sinonim, Antonim, dan Analogi) By Pak Anang (http://pak-anang.blogspot.com) A. PENALARAN VERBAL 1. SINONIM (Padanan Kata) Soal-soal sinonim, kemampuan yang dituntut adalah adik-adik mampu mencari arti dari sebuah kata pada pilihan jawaban yang tersedia. Tips agar adik-adik mudah menyelesaikan soal tentang sinonim adalah sering membaca. Nah, saat menemukan kata-kata asing, jangan ditinggalkan begitu saja, catat dan coba mencari padanan katanya di Kamus Besar Bahasa Indonesia. TRIK SUPERKILAT: Seringkali ada pilihan jawaban yang hampir mirip dengan soal. Biasanya jawaban ini adalah diberikan sebagai jawaban jebakan. Contoh soal sinonim: PARTIKELIR = .... A. Tukang parkir B. Partisan C. Partisi D. Swasta E. Enterprener Pembahasan: Jawaban B dan C mirip dengan kata yang digunakan pada soal. Biasanya ini mudah kita eliminasi sebagai jebakan jawaban..... Sehingga mempemudah kita dalam menjawab soal sinonim ini. Jawaban yang tepat adalah ”swasta”. 2. ANTONIM (Lawan Kata) Soal tentang antonim ini kebalikan dari sinonim. Dalam soal antonim adik-adik dituntut untuk mencari lawan kata dari soal yang diberikan. Contoh soal antonim: TERKATUNG A.Melayang B.Pasti C.Ombak D.Terperosok E.Terbenam

SBMPTN Bahasa Inggris - zenius.net

Over this decade, employment in jobs requiring education beyond a high school diploma will grow more rapidly than employment in jobs that do not; of the 30 fastest growing occupations, more than half require post-secondary education. With the average earnings of college graduates at a level that is twice as high as that of workers with only a high school diploma, higher education is now the clearest (31) ... into the middle class. In higher education, the U.S. has been outpaced internationally. While the United States ranks ninth in the world in the proportion of young adults enrolled in college, we have fallen to 16th in the world in our share of certificates and degrees awarded to adults ages 25-34 — lagging behind Korea, Canada. Japan and other nations. While more than half of college students graduate within six years, the (32) ... for low-income students is around 25 percent. Acknowledging these factors early in his administration, President Obama challenged every American to commit to at least one year of higher education or post-secondary training. (33) ... that America would once again have the highest proportion of college graduates in the world by 2020. 31. The opinion that best completes (31) is ... (A) Effort (B) Position (C) Beginning (D) Advantage (E) Pathway 32. The opinion that best completes (32) is ... (A) Learning achievement (B) Academic capacity (C) Completion rate (D) Logical understanding (E) Intellectual development ...

fx-991ES PLUS C - Support - Casio
by bodo 0 Comments favorite 4 Viewed Download 0 Times

Contents Important Information ............................................................. 2 Sample Operations .................................................................. 2 Initializing the Calculator ........................................................ 2 Safety Precautions .................................................................. 2 Handling Precautions.............................................................. 2 Removing the Hard Case ........................................................ 3 Turning Power On and Off ...................................................... 3 Adjusting Display Contrast .................................................... 3 Key Markings ........................................................................... 3 Reading the Display ................................................................ 4 Using Menus ............................................................................ 5 Specifying the Calculation Mode .......................................... 5 Configuring the Calculator Setup .......................................... 5 Inputting Expressions and Values ......................................... 7 Recurring Decimal Calculations ......................................... 10 Toggling Calculation Results ............................................... 14 Basic Calculations................................................................. 14 Remainder Calculations ....................................................... 18 Prime Factorization ............................................................... 19 Function Calculations ........................................................... 20 Complex Number Calculations (CMPLX) ........................... 25 Using CALC............................................................................ 26 Using SOLVE.......................................................................... 27 Statistical Calculations (STAT) ............................................. 29 Base-n Calculations (BASE-N) ............................................. 33 Equation Calculations (EQN) ............................................... 35 Matrix Calculations (MATRIX)............................................... 37 Creating a Number Table from Two Functions (TABLE) .... 39 Vector Calculations (VECTOR) ............................................. 41 Inequality Calculations (INEQ) ............................................ 43 Using VERIFY (VERIF) .......................................................... 45 Distribution Calculations (DIST) .......................................... 47 Scientific Constants .............................................................. 50 Metric Conversion ................................................................. 51 Calculation Ranges, Number of Digits, and Precision....... 52 Errors ...................................................................................... 54 Before Assuming Malfunction of the Calculator... ............. 56

LM35 Precision Centigrade Temperature Sensors (Rev. D)

Product Folder Sample & Buy Technical Documents Support & Community Tools & Software LM35 www.ti.com SNIS159D – AUGUST 1999 – REVISED OCTOBER 2013 LM35 Precision Centigrade Temperature Sensors FEATURES DESCRIPTION The LM35 series are precision integrated-circuit temperature sensors, with an output voltage linearly proportional to the Centigrade temperature. Thus the LM35 has an advantage over linear temperature sensors calibrated in ° Kelvin, as the user is not required to subtract a large constant voltage from the output to obtain convenient Centigrade scaling. The LM35 does not require any external calibration or trimming to provide typical accuracies of ±¼°C at room temperature and ±¾°C over a full −55°C to +150°C temperature range. Low cost is assured by trimming and calibration at the wafer level. The low output impedance, linear output, and precise inherent calibration of the LM35 make interfacing to readout or control circuitry especially easy. The device is used with single power supplies, or with plus and minus supplies. As the LM35 draws only 60 μA from the supply, it has very low self-heating of less than 0.1°C in still air. The LM35 is rated to operate over a −55°C to +150°C temperature range, while the LM35C is rated for a −40°C to +110°C range (−10° with improved accuracy). The LM35 series is available packaged in hermetic TO transistor packages, while the LM35C, LM35CA, and LM35D are also available in the plastic TO-92 transistor package. The LM35D is also available in an 8-lead surface-mount smalloutline package and a plastic TO-220 package.

What's New in Java 7 - Java.net

What’s New in Java 7 for San Antonio Java User Group May 2010 What’s New in Java 7 Top 5 Main features in Java 7 • Modularity • Language Changes • Multi Language Virtual Machine • Garbage Collector • New File I/O API San Antonio Java User Group – Subramanian Murali May 2010 What’s New in Java 7 Modularity – What is the need? • Java SE has grown BIG •More and more functionality is added in Java SE •Java SE – the foundation of Java EE • Underlying Implementation code is interconnected • Class path Hell • No version management for JARs • No dependencies mechanism San Antonio Java User Group – Subramanian Murali May 2010 What’s New in Java 7 Module – an Example module A @ 1.0 { requires B @ 2.1; requires C @ 1.1; } module A; package com.sample; public class sample class { public void sample() {} } module definition stored in moduleinfo.java -The sample class belongs to the module A version 1.0 - This class is public - If class or one of its members or constructors is declared module, it will be accessible from a type that belongs to the same module San Antonio Java User Group – Subramanian Murali May 2010 What’s New in Java 7 Language Changes - Additions to the Java Language itself - Sun very much conservation to language additions - because language changes are permanent and cannot be removed - No big features like support for closures - Only simple and useful language changes in Java 7 - Under the Open Source Project Coin (signifies small changes)...

Tags: Java 7, Software,
BAHASA INGGRIS IPA PAKET B Kunci Jawaban Soal B 1. Jawaban ...

BAHASA INGGRIS IPA PAKET B Kunci Jawaban Soal B 1. Jawaban : B Dari judul menunjukan bahwa petunjuk diperuntukan bagi mereka yang akan menikah. Regulations for Wedding/Receptions 2. Jawaban : A Informasinya ada di text kalimat no 2. The cost for a wedding or reception is £8.00 per person. If the reception includes catering, the cost will be an additional £20.00 per person. 3. Jawaban : A Informasinya ada di text kalimat no 5. This deposit will be refunded provided the grounds are left free of damage and litter. 4. Jawaban : B Reception artinya resepsi. Prompt: cepat, Welcome: selamat datang, Release: melepas, Party:pesta, Invitation: undangan. Jadi jawabannya adalah Welcome. 5. Jawaban : A Rehearsal artinya latihan. Preparation: persiapan, Implementation: pelaksanaan, Orientation: orientasi, Correlation: korelasi, Duration: lamanya waktu. Jadi jawabannya adalah preparation 6. Jawaban : C Terdapat pada paragrap pertama, yaitu “Although speech is the most advanced form of communication, there are many ways of communicating without using speech. Signals, signs, symbols, and gestures may be found in every known culture.” Bahwa Signals, signs, symbols, and gestures adalah bagian dari communication.

Haltech E8 to Mazda RX-7 FD W...
by robeo 0 Comments favorite 9 Viewed Download 0 Times

E6X Wiring Diagram Mazda RX-7 3rd Gen Series 6 TRIGGER INPUTS Main Trigger Ground A 13 6 26 26 TRIGGER GROUND B C HOME TRIGGER E HOME GROUND Main Trigger Signal Home Trigger Signal HOME TRIGGER HOME GROUND From Sensor Supply Via 15A Fuse +SEN Ne- to Ground (Red) MAIN TRIGGER D MAIN TRIGGER TRIGGER GROUND Home Trigger Ground Ne+ (12 teeth) to Main Trigger Pos. (Yellow) G+ (1 tooth) to Home Trigger Pos. (Green) G- to Ground (Blue) F Note: Shielded cable should be wired at ECU end only. 26 27 36 35 34 GROUND [B] AUX. OUT [G / B ] IGNITION #1 [W/B] IGNITION #3 [L] IGNITION #4 Not Used [ LG ] IGNITION #2 Not Used [L/Y] Leading Coil Signal Trailing Front Coil Signal Trailing Rear Coil Signal +12V Switched Power [B/R] Leading Coil Signal (from Igniter) 12 [Y/L] Not Used Trailing Front (from Igniter) 20 21 INJECTOR #1 Leading Coil Neg. 22 Leading Input (From Haltech Ign1) Trailing 2 Coil Neg. +12V Supply for Injectors and Sensors. 26 32 L1 / L2 T2 [G/R] [P] T1 [L/R] INJECTOR #3 [L/W] [ LB ] INJECTOR #2 INJECTOR #4 19 [R] Trailing Rear (from Igniter) [ LG / B ] [ LG ] [ LG / W ] +12V Power Supply [B/W] Trailing 2 Input (From Haltech Ign3) [ BR / B ] Trailing 1 Coil Neg. GROUND [G/R] +SEN Stock FD Igniter GROUND Trailing 1 Input (From Haltech Ign2) Secondary Rear Rotor LOOKING AT ECU CONNECTOR 1 18 19 36 Secondary Rear Rotor Primary Rear Rotor [ BR ] Primary Front Rotor LEGEND - WIRE COLORS: Haltech E6X to Mazda RX-7 FD3S B = BLACK BR = BROWN G = GREEN GY = GREY L = BLUE O = ORANGE P = PINK R = RED V = VIOLET Y = YELLOW When two colors are used in a wire by the alphabetical code, the first letter indicates the basic wire color, the second indicates the color of stripe. (Ex. O/R = Orange with Red stripe, GY/R = Grey with Red stripe) Series 6, FD3S, 93-95, Stock CAS & Igniter/Coil Wiring Haltech USA - www.haltech.com

Mountain States Drivetrain Extended Warranty 6 Months, 6000 Miles

WARRANTY: Mountain States Drivetrain Inc. (MSD) warrants it’s manual transmissions/transfer cases (“Product”) against defects in workmanship or materials to the vehicle owner in which the product is installed (“Buyer”), from the date of installation, for 6 months or 6,ooo miles, whichever occurs first, for parts. MSD will replace or repair, at its option, the failed Part. This Limited Warranty applies to the Product and items directly related to it as identified on the Installer Repair Order referenced above. By purchasing this manual transmission/transfer case, Buyer accepts and agrees to comply with the terms of this Limited Warranty. Any repairs or replacements will not extend the Warranty. WHAT IS NOT COVERED: A. Damage to the manual transmission/transfer case due to installation errors. B. Damage caused by any other part or external part failure. C. If you are not a licensed repair facility or an ASE certified mechanic and you wish to install an MSD manual transmission/transfer case, you must receive prior authorization or this warranty will be void. D. Damage caused by (1) overheating: (2) accident: (3) abuse or an operation for which it was not designed; (4) damage resulting from external components not included in the sale: (5) lack of fluids or lubricants, etc; (6) alterations of the vehicle, altering either the power train or suspension system from the original manufacturer's specifications: (7) improper installation; (8) towing or hauling in excess of manufacturer's specifications (refer to the vehicle's owners manual) E. Incidental or consequential damages including, but not limited to (1) lost profits, sales or income; (2) injury to person or property; (3) damage from fluids or other substances; (4) lift, dock or storage fees; (6) fluids or any additional related parts; (7) substitute transportation, lodging, towing, etc; or (8) unauthorized repairs. Some states do not allow the exclusion or limitation of consequential damages, so the above limitation or exclusion may not apply to you.

« previous  123456789