SEARCH

Found 8623 related files. Current in page 1

oldsmobile bravada low side service port

FiFA World CUp™ internAtionAl FootBAll sUpremACY

FiFA World CUp™ internAtionAl FootBAll sUpremACY A leader in international sports marketing Infront Sports & Media is an experienced international full-service sports marketing company with a capacity for innovation that is helping to transform the industry. These innovations have enhanced every area of sports marketing, including distribution of rights, host broadcast, programme production, event operations, brand development, sponsorship and online entertainment. © Infront Sports & Media AG 2014, Corporate Communications. All rights reserved. Editorial Contact: info@infrontsports.com www.infrontsports.com FIFA WORLD CUP™ INTERNATIONAL FOOTBALL SUPREMACY WINTER SPORTS The Fédération Internationale de Football Association (FIFA) has appointed Infront as exclusive sales representative for the distribution of broadcast rights to the 2018 and 2022 FIFA World Cups™ as well as all Other FIFA Events (OFEs) 2015-2022 across 26 Asian territories including China, Hong Kong, India, Indonesia, Singapore and Thailand. Key Facts •• The FIFA World Cup™ is the most popular sports event in the world – Other FIFA Events also register a strong growth in popularity •• Infront handles the distribution of media rights to the 2018 and 2022 FIFA World Cups™ and all other FIFA Events 2015-2022 •• Infront is responsible for 26 Asian territories comprising Afghanistan, Bangladesh, Bhutan, Cambodia, China, Chinese Taipei, Hong Kong, India, Indonesia, Kyrgyzstan, Laos, Macau, Maldives, Mongolia, Myanmar, Nepal, Pakistan, Philippines, Singapore, Sri Lanka, Tajikistan, Thailand, Timor Leste, Turkmenistan, Uzbekistan and Vietnam

BYS9063_Form 2359 Tube Replacement.indd - Bryan Boilers

Tube Replacement Instructions: CL/CLM & HECL/HECLM Models Bryan Steam, the originator and leader in the production of flexible tube water and steam boilers for over 90 years, is pleased to provide you with the technical and service information you need to keep your Bryan Boiler running. These instructions will give you the information you need to remove and replace tubes on a CL/CLM or HECL/HECLM Model Bryan Boiler. Here are a few points to consider when inspecting your boiler. 1. Inspect your boiler annually to find and replace bad tubes. 2. These are the two warning signs that a tube is bad: • A knocking sound in the tube bank of the boiler indicates a possibly clogged tube. • A white ash visible along the bottom of a tube or tubes indicates that the tube is getting too hot from reduced water flow. Required Tools for Tube Replacement: 1" tube puller 1" tube driver 50/50 mixture pipe dope and cutting oil 1" paint brush 3 lb. hammer 9/16" socket wrench half round file full round file piece of emery cloth a tool to bend the tube studs (or small socket/ratchet set) ...

Coflexip® - Flexible Steel Pipe for Drilling and Service ... - Technip

DESCRIPTION OF A COFLEXIP® FLEXIBLE LINE The Coflexip® Flexible Line Coflexip® products are designed for oilfield services, both on and offshore, where heavy duty is required in combination with Flexible lines are manufactured in long continuous sections (up to several kilometres) and are cut to fit each client's requirements. End fittings with the most common types of end connectors are kept in stock thus minimising delivery times. End connectors not kept in stock will be machined or obtained according to the client's specifications. Delivery time depends mainly on the type of end connectors required and our client’s particular specifications. The pipe structure Coflexip® pipes are composed of successive layers of steel and thermoplastic to produce unique structures that have the strength and durability of steel pipes combined with the flexibility of reinforced rubber hoses. Each layer works independently from the others, as no vulcanisation is used during manufacturing. This results in the structural stability of the pipe. flexibility and Functions of Coflexip® pipe components reliability. These requirements are in applications such as: Choke and kill lines Rotary and vibrator lines Test lines Hydraulic lines Acid and cement lines Nitrogen lines Coflexip® flexible pipes for drilling and service applications are manufactured by the Drilling & Refining Applications Division of the Technip Group 2 1. The thermoplastic inner tube makes the pipe leak-tight. 2. The interlocked zeta and flat steel spiral pressure carcass resist internal pressure and external crushing loads. 3. The intermediate thermoplastic sheath is an anti-friction layer. 4. The double crosswound steel armours resist axial loads, protect the pipe from torsional strain resulting from handling and working conditions. 5. The thermoplastic outer jacket protects the armours from external corrosion. 6. The Stainless Steel Outer Wrap (SSOW), protects the pipe from mechanical impact, abrasion, weathering and accidental mishandling.

Custom Labeled Bottled Water

Samantha Springs offers custom labeled bottled water service to help promote the business of clients in Dallas/Fort Worth Metroplex. The company provides the quality custom labeled bottled water service at affordable rates. To avail the bottled water service, visit – www.samanthasprings.com

Suzuki Hayabusa Gen 2 Upper Fairing Removal.pdf - Hayabusa.oRg

Suzuki Hayabusa Gen 2 Upper Fairing Removal. This can be used to take off the panels to get to the fuse block, Gauge Cluster, changing bulb, anything behind ... Suzuki Hayabusa Gen 2 Upper Fairing Removal. This can be used to take off the panels to get to the fuse block, Gauge Cluster, changing bulb, anything behind the upper cowl. Step 1: Remove these bolts on both sides of the bike. 4mm Hex 2nd Step Remove these plastic pin (both side) by inserting a small flat head screw driver and popping it up. Step 3: Remove this bolt located center and below the triple Tree. Step 4: this piece should easily pop out. Notice that there is another push pin hidden? Step 5: Remove this pin by pushing the center. (Both sides) Suzuki Hayabusa Gen 2 Upper Fairing Removal. This can be used to take off the panels to get to the fuse block, Gauge Cluster, changing bulb, anything behind the upper cowl. Step 1: Remove these bolts on both sides of the bike. 4mm Hex 2nd Step Remove these plastic pin (both side) by inserting a small flat head screw driver and popping it up. Step 3: Remove this bolt located center and below the triple Tree. Step 4: this piece should easily pop out. Notice that there is another push pin hidden? Step 5: Remove this pin by pushing the center. (Both sides)

Suzuki Hayabusa 2000 - 2005
by nkono 0 Comments favorite 3 Viewed Download 0 Times

Suzuki Hayabusa 2000 - 2005 Engine Protection Cage installation instructions Items included in this kit Cage loop (1each) Side struts (2 each) Extended frame sliders (2 each) Hardware kit (1 each) (contents listed below) M10-1.25 x 70mm bolt (1 each) M10-1.25 x 80mm bolt (1 each) ¼”-20 x 1 ½” bolts (2 each) ¼”-20 x 2” bolts (2 each) ¼”-20 lock nuts (4 each) 3/8”-24 x ¾” bolts (2 each) Flange Bushings (2 each) M10-1.5 x 15 1/2" all thread rod (1 each) M10-1.5 hex nuts (2 each) 1. Follow installation instructions for extended frame sliders. (See page 1) Note: Do not attach delron tips or tighten extended frame sliders until all components are installed. 2. Place the cage loop inside short telescoping tubes on sliders (See fig. G), push the ¼”-20 x 1 ½” bolts through the bolt holes in the telescoping tubes from the outside and start the ¼”-20 lock nuts. Do not tighten lock nuts at this time. 3. Install the left side strut using the all thread rod, flange bushings and hex nuts provided. Slide the following components over one end of the all thread rod in this order: flange bushing marked with "L", side strut marked with "L" and one M10-1.5 hex nut. (See fig A) Slide the all thread rod through the swing arm bolt on the left side of the motorcycle. (make sure the flange bushing slides into the swing arm bolt) On the right side of the motorcycle slide the following components over the all thread rod in this order: flange bushing marked "R", side strut marked "R" and M10-1.5 hex nut. (you may need to hold the left side to ensure it stays in place) 4. Push the bottom of the cage loop towards the rear of the motorcycle while pulling the bottom of the left side strut towards the front until the bolt hole on the side strut meets the threaded hole on the tab welded to the cage loop. Attach the side strut to the outside of the tab on the cage loop with a 3/8”-24 x ¾” bolt. (See fig J) Do not tighten the bolt at this time. Repeat for other side. 5. Once all components are attached tighten all bolts and nuts. Be sure to torque all engine mount bolts to factory specifications. Torque the hex nuts on the all thread stud to 12ft lbs. We recommend using "blue" loctite on the all thread stud to ensure the hex nuts do not vibrate loose. 6. Install delron tips with ¼”-20 x 2” bolts and ¼”-20 lock nuts.

Full System Instructions - Two Brothers Racing

Installation Instructions 1. Make sure the bike is completely cool before starting the installation. Make sure the bike is secure on a centerstand or ideally a service lift. 2. Remove rear lower cowling. 3. Remove OEM mufflers. V.A.L.E. TM 2008 Suzuki V a r i a b l e A x i s L o c k i n g E x h a u s t HAYABUSA V.A.L.E.™ Complete Exhaust System with M-2 Canister Part # 005-1930106V / 005-1930107V / 005-1930108V 8. 9. 4. The horn should also be removed for more radiator clearance. Install the TBR head pipes. (Each piece is labeled for proper postioning). From Left to Right, install head pipes 1, 2, 3, and then 4. Use the OEM gasket between the head pipes and cylinder head. Remove cowling from both the left and right sides. “M” Parts List Qty. Description 1 15” Muffler Canister 1 4-2-1 Slip-on Tube 1 4-2-1 Header Assembly 1 HARDWARE KIT 1 8x55mm Socket Head Flat Bolt (Black) 6 80mm Springs 1 8x16mm Flange Bolt 4 6x14mm Socket Head Cap Screw 1 Barrel Clamp 1 5mm Long Handle Ball End Hex Wrench 4 6mm Split Lock Washer 2 TBR Script Logo Yellow Decal 4” “1” Muffler Slip-tube Part Number Varies 005-19301S 005-19301HK 005-193-3C 005-SHF855B 005-S-80 005-FB816 005-SH814 005-27-66MSH 005-9-18610 005-WL6 015-10208-A 5. “2” “3” “R” “4” Remove radiator braces. 6. “L ” Remove O2 sensore from OEM head pipe. 10. Install the collectors to the bottom of the head pipes. The collectors are labeled “L for left and “R” for Right. ” IMPORTANT - PLEASE READ CAREFULLY We recommend that this performance part be installed by a qualified motorcycle technician. If you have any doubts as to your ability to install this performance part, please consult with your local motorcycle dealer. Read all instructions first before starting installation. Make sure the motorcycle and exhaust system are completely cool before starting the installation. Also, make sure the bike is secure on a centerstand or ideally a service lift during installation. Be sure to save all stock components for possible use later.

2009 Hayabusa - PCV - MPS Racing
by nkono 0 Comments favorite 4 Viewed Download 0 Times

Parts List Power Commander USB Cable CD-ROM Installation Guide Power Commander Decals Dynojet Decals Velcro® Strip Alcohol Swab Wire tap O2 eliminator The ignition MUST be turned OFF before installation! YOU CAN ALSO DOWNLOAD THE POWER COMMANDER SOFTWARE AND LATEST MAPS FROM OUR WEB SITE AT: WWW.POWERCOMMANDER.COM PLEASE READ ALL DIRECTIONS BEFORE STARTING INSTALLATION 2191 Mendenhall Drive 20-008 www.powercommander.com North Las Vegas, NV 89081 (800) 992-4993 www.powercommander.com 2009 Suzuki Hayabusa PCV - 1 POWER COMMANDER V INPUT ACCESSORY GUIDE A C C E S S O RY I N P U T S Map - The PCV has the ability to hold 2 different base maps. You can switch on the fly between these two base maps when you hook up a switch to the MAP inputs. You can use any open/close type switch. The polarity of the wires is not important. When using the Autotune kit one position will hold a base map and the other position will let you activate the learning mode. When the switch is “CLOSED” Autotune will be activated. Shifter- These inputs are for use with the Dynojet quickshifter. Insert the wires from the Dynojet quickshifter into the SHIFTER inputs. The polarity of the wires is not important. Speed- If your application has a speed sensor then you can tap into the signal side of the sensor and run a wire into this input. This will allow you to calculate gear position in the Control Center Software. Once gear position is setup you can alter your map based on gear position and setup gear dependent kill times when using a quickshifter. USB CONNECTION CRANK ANALOG EXPANSION PORTS 1 & 2 Optional Accessories such as Color LCD unit or Auto tune kit.

Suzuki Hayabusa & GSX-R 1000 Cylinder Head ... - Vance & Hines

Suzuki Hayabusa & GSX-R 1000 Cylinder Head Price Sheet Vance & Hines Motorsports has the experience and most up to date computer controlled machines for every facet of engine preparation and performance parts. Byron Hines engines and pro heads have set more records and won more races than anyone else in motorcycle drag racing. Vance & Hines Motorsports also offers comprehensive head packages for Road Racing, Motorcross and Supercross engines. Hayabusa Heads Pro Port $1,320.00 Street Port $ 625.00 Competition Valve Job & Drop Valve Guides $ 375.00 Competition Valve Job $ 375.00 Surface $ Surface $ 60.00 $1,755.00 60.00 $1,060.00 Optional Parts & Service • • • • • • • • Weld Emission Ports Cam Cut (Cam Caps) (.425 Lift & above) 99-07 Spring Kit with Titanium Retainers 08 Spring Kit with Titanium Retainers Valve Seals Stainless Steel Oversize Valves Camshafts Adjustable Cam Sprockets $ 100.00 $ 150.00 $ 365.63 $ 399.00 $ 45.00 $ 360.00 $ 698.00 $ 145.00 GSX-R 1000 Heads Pro Port $1,320.00 Street Port $ 625.00 Competition Valve Job & Drop Valve Guides $ 375.00 Competition Valve Job $ 375.00 Surface $ Surface $ 60.00 $1,755.00 60.00 $1,060.00 SF-1020 Flowbench Optional Parts & Service • • • • • • • Weld Emission Ports Bore Lifter Buckets Valve Springs Valve Seals Stainless Steel Oversize Valves Camshafts Adjustable Cam Sprockets...

RCC Turbos - Stage 1 Turbo Install - Suzuki Hayabusa - Gen 1

RCC Turbos - Stage 1 Turbo Install: Suzuki Hayabusa (Gen 1) • Preparation/Disassembly: Remove the seat. Disconnect negative terminal on the battery. Drain the fuel tank. Remove the fuel tank. Remove the stock fuel pump from the tank. Remove the air box. Remove the MAP sensor and temperature sensor from the air box. Remove left and right side fairings. Drain engine oil. Drain engine coolant. Remove the oil filter Remove the oil restrictor, behind the filter. Remove the oil cooler lines. Remove the radiator and oil cooler, as one unit, leaving only the bracket/support for radiator (before reinstalling the radiator please remove all the tabs along the bottom of the radiator). Remove the entire exhaust system. Remove the PAIR system. Remove the oil pan from the engine. • Sensor Bracket Modification: On the left hand side of bike, on the inside of the frame, you will see a bracket, with a plastic vacuum canister, vacuum control solenoid valve, atmospheric pressure sensor, and some vacuum lines, with a check valve in the vacuum line. Please remove this entire bracket, eliminate all the vacuum lines, the plastic canister, and the control solenoid valve, and also cut off the metal tab that held the vacuum canister. Then reinstall this bracket with only the atmospheric pressure sensor, and plug the wires back in. • Tap/plug PAIR System Holes: Tap the four small PAIR system holes, above the exhaust ports, with an M6 x 1.0 tap. Install the four small M6 screws into the exhaust holes after tapping them. • Modify the Oil Pan: Drill a ¾” hole on the left side of the oil pan. Use thread sealant on the washer, and red Loctite on the threads. Make sure the sealing washer is against the inside of pan, then the stainless flat washer, then the nut. Once the fitting is installed, reinstall the oil pan. • Install Header/Turbo/Oil Lines/Exhaust: Install the header and turbo as a unit, but with the bolts loose. Use four of your original header bolts on the top of the turbo header (Allen head). Use the four new bolts on the bottom row of the header (M8, 10mm flange head). PLEASE NOTE! After installing the dump pipes and waste gate, the nipple on the top of the waste gate remains open, and no hose gets installed on the top fitting. The top fitting is used for boost control on Stage 2 and higher end kits. It is not used on Stage 1 kits.

« previous  123456789