SEARCH

Found 3687 related files. Current in page 1

malayalamkambikathakal read 2000

Guide to Healthy Eating
by guidetohealthyeating 0 Comments favorite 5 Viewed Download 0 Times

Guide to Healthy Eating Hallo Ladies! I hope you don't forget about your annual checks to detect any health irregularities. Do read more! Visit: http://www.juicerbreak.com/

SMS/Text Marketing More Effective Than Social Media

https://omnimobilemarketing.com/ | With social media having become so popular in most recent years, even businesses are trying to cash in, but what happens when social media platforms have become inundated with countless businesses trying to profit off of the social boom? Social media suddenly loses it’s power. 29% of tweets are read, 12% of Facebook posts are read and nobody sees your Google+ post. There are better options out there to reach customers in an instant such as SMS and text marketing.

Universal grinding machine for the most Demanding ... - Hardinge Inc.

KEL-VIVA Universal grinding machine for the most Demanding Applications KEL-VIVA The innovative grinding system 2 2 different wheelheads UR-wheelhead R-wheelhead Wheelhead with fixed intermediate section B-axis KEL-SET automatic grinding wheel measuring system (option) Heidenhain control system GRINDplusIT Windows 2000 2-processors control system C-axis for unround components and threads (option) Hydrostatics X- and Z-guideways no stick slip good damping Scale on upper table for setting-up of table assemblies metric imperial Prepared connecting plates for table flooding for diamond cooling for stabilizing of measuring unit Flushing of base pan for good conveyance of grinding dust prevents dirt deposits Precision with hydrostatics These CNC universal cylindrical grinding machines have been developed to satisfy the highest demand for quality. Intensive application studies and the use of stateof-the-art technology in development and production have resulted to this universal grinding machine. Hydrostatic guideways and a strict separation of the machine base from the assemblies, generating heat or vibration, provide superb precision and productivity. The excellent static and dynamic rigidity of the machine base permits a three-point set-ut. The KEL-VARIA therefore has no particular requirements on the building’s...

Grinding Machine Operator (PDF) - Micro 100

Grinding Machine Operator Application available online at www.micro100.com Select Careers tab FAX Application or Resume: 955-1314 Job Description: Operate manual grinding machines in the manufacture of carbide cutting tools. Must be able to read and understand blueprints. Prior experience using calipers, micrometers, or other measuring equipment is preferred. Good math and mechanical skills a plus. Shifts Available for Hire: Night Shift—5% Shift Premium Monday-Wednesday from 5pm - 5am, and Thursday from 4pm - 9:30pm. Weekend Shift—7 ½% Shift Premium Thursday 10:30am—4pm, Friday-Sunday 5am – 5pm Physical requirements of the job: Long periods of standing and walking; ability to lift up to 50 lbs. Benefits Available after 60 days: Medical, Dental, Vision, Life, Disability Insurance; 401k— 1yr., vacation, holiday, & personal Minimum Exp: 6 months to 1 YR Preferred Minimum Education: GED Hours Per Week: 40 Shifts: Night & Weekend Shift Salary: DOE Job License: No...

rhode island college anchor notes - Rhode Island College Athletics

Rhode Island College Anchor Notes The Official Newsletter of Rhode Island College Intercollegiate Athletics Or visit us at: www.GoAnchormen.com Vol. X No. 4 Providence, Rhode Island Spring Review/Summer Preview June 2009 RIC Mourns the Passing of James Adams James “Jimmy” Adams Fund Established Rhode Island College was saddened by the loss of legendary former Head Men’s Basketball Coach James Adams who passed away on June 1 at the age of 73 after an illness. Adams spent 21 years at Rhode Island College, serving as an Assistant Athletic Director in addition to his coaching duties. He officially retired in September of 2000 and then went on to work part-time as a supervisor at the college’s Recreation Center until the fall of 2008. He will be inducted into Rhode Island College’s Athletic Hall of Fame this October. The James “Jimmy” Adams Fund has been established in his honor, with all proceeds benefitting RIC student-athletes. Please contact the RIC Athletic Department at (401) 456-8007 to make a contribution to the fund.

JANE WILLIAMS - Rhode Island College
by klinsy 0 Comments favorite 4 Viewed Download 0 Times

JANE WILLIAMS, PhD, RN Dean and Professor of Nursing School of Nursing, Rhode Island College 600 Mt. Pleasant Avenue, Providence, RI 02908 TEL: 401 456-9608: FAX: 401 456-8206 Email: jwilliams@ric.edu CURRENT EMPLOYMENT Rhode Island College, Dean and Professor of Nursing, School of Nursing, 1975-present; initial appointment as assistant professor, 1975; appointed Professor, 1995, Department Chairperson, 2000, and Dean, 2007. EDUCATION University of Rhode Island, College of Nursing, Kingston, Rhode Island, Ph.D., Nursing, 1995. New York University, School of Education, New York, New York, M.A., Major in Education and Minor in Nursing, 1968; University of Michigan, School of Nursing, Ann Arbor, Michigan, B.S.N. with Distinction, 1966. PUBLICATIONS Williams, J., Brumbaugh, M. & Vares, L., (2006), “Education to improve interdisciplinary practice of health care professionals: A pilot project”, Medicine & Health, Rhode Island, 89 (9), p. 312-313. Mosser, N., Williams, J. & Wood, C. (2006), “The use of progression testing throughout nursing programs: How two colleges promote success on NCLEX-RN”. Annual Review of Nursing Education. Vol.4, p. 305-319. Newman, M. and Williams, J. (2003) "Educating Nurses in Rhode Island: A lot of diversity in a little place", Journal of Cultural Diversity, Vol. 10, No. 3, p. 91-95. Williams, J., (2001) “The Clinical Notebook: Using Student Portfolios to Enhance Teaching and Learning, Journal of Nursing Education. Vol. 40, p. 135-137. Ferszt, G., Massotti, E., Miller, J. & Williams, J. (2000) “Art on Rounds: Research Study of an in-patient oncology unit”, Illness Crisis and Loss. Vol. 8, No. 2, pp. 189-199. Williams, J. (1999) “When Interns Meet Managed Care” [Letter to the Editor]. New York Times, p. 30A. Williams, J., Wood, C., & Cunningham-Warburton, P. (1999) “A Narrative Study of Chemotherapy-Induced Alopecia”. Oncology Nursing Forum. Vol. 26, pp. 1463-1468. Willliams, J. (1999) “Health Policy Tool Kit Helps Students to Get Involved”. ONS Newsletter, 14 (9) p 5.

HYDRO-BOOST BRAKE BOOSTER Installation Guide REMOVING ...

930394-52 Rev. 12/22/05 4:21 PM Page 1 HYDRO-BOOST BRAKE BOOSTER Installation Guide 4. Enable ignition system and start the engine. 7. Check fluid level and add fluid if needed. 5. Turn the steering wheel from stop to stop several times. Do not hold it against the stop. 8. Again start engine and turn steering wheel from stop to stop several times (avoid turning fully against stops as much as possible). Recheck fluid level and fill as required. If there is evidence of fluid foaming, turn off engine and wait an hour for foam to clear. Lacks Power Assist Booster or Pedal Chatters X X X Looses Reserve Pressure HAIRPIN CLIP BRAKE PEDAL PUSHROD X PUSHROD SPACER PUSHROD BUSHING 6. Loosen the locknuts holding the HydroBoost unit to the firewall and then slide the linkage, nylon washers and brushing off the pedal pin. 4. Disconnect all hydraulic lines from the Hydro-Boost unit (pressure, steering gear and return lines). PRESSURE LINE MASTER CYLINDER HYDRO-BOOST SPACER X X X BRAKE LINES DO NOT DISCONNECT JDA356 STOP-LIGHT SWITCH 3. Separate the master cylinder from the mounting studs. N OT E : DO NOT disconnect the brake lines from the master cylinder unless necessary to avoid bending or damaging those lines. X Pedal Returns Slowly 5. Disconnect the Hydro-Boost pushrod linkage from the brake pedal. NOT E : It may be necessary to remove the stoplight switch from the brake pedal. If so, unplug the stoplight switch wires, remove the hairpin retainer, slide the switch off the pedal pin just far enough to permit removing the switch from the pin. Do not damage the switch. N OT E : Before beginning work, be sure vehicle is parked in a level area and that wheels are chocked to prevent unintentional movement. Read all of these instructions before attempting to install the HydroBoost unit. 2. Remove the nuts attaching the master cylinder to the Hydro-Boost unit.

Safety Recall No. 983 Brake Booster Vacuum Hose

Safety Recall No. 983 Brake Booster Vacuum Hose Models 2000-2001 (PL) Dodge and Plymouth Neon NOTE: This recall applies only to the above vehicles equipped with a: Ø 2.0L engine (“C” in the 8th VIN Position) built through March 21, 2001 (MDH 0321XX) or a Ø 2.0L High Output engine (“F” in the 8th VIN Position) built through April 11, 2001 (MDH 0411XX). IMPORTANT: Some of the involved vehicles may be in dealer new vehicle inventory. Federal law requires you to stop sale and complete this recall service on these vehicles before retail delivery. Dealers should also consider this requirement to apply to used vehicle inventory and should perform this recall on vehicles in for service. Involved vehicles can be determined by using the DIAL VIP System. Subject The brake booster vacuum hose on about 350,000 of the above vehicles may swell due to oil contamination and become disconnected. A disconnected hose could cause a loss of power brake assist and an increase in engine idle speed. This can increase stopping distance and cause an accident without warning. Repair The brake booster vacuum hose must be replaced. © Copyright 2001, DaimlerChrysler Corporation, All Rights Reserved Safety Recall No. 983 -- Brake Booster Vacuum Hose Page 2 Parts Information Each dealer to whom vehicles in the recall were invoiced (or the current dealer at the same street address) will receive enough Brake Booster Vacuum Hoses to service about 10% of those vehicles. Dealers should determine which brake booster vacuum hose is required for each vehicle at the time appointments are scheduled to assure that the correct part is available when the customer arrives. The vacuum hose for the vehicle to be serviced may be determined by: Ø Using the part code in the third column of the VIN list along with the following table (involved dealers); Ø Using the VIN and part number list electronically transmitted to DIAL System Function 53 (involved dealers); or...

Excelon RNT Clear Flexible PVC Tubing Specifications

Clear Flexible PVC Tubing • Clear material, with a dense, smooth bore • Resistant to oxidation, chemicals and bacteria • Chemical or thermal bonding • Can be gas or radiation sterilized Physical Properties** • Extreme flexibility permits easy set-ups RNT Hardness, Shore A Tensile Strength, psi Elongation at Break, % Brittle Temperature, °F Specific Gravit y 68 2000 400 -41 1.20 • Available in transparent or opaque colors • Flushes clean with most conventional cleaners and sanitizers ** Values listed are typical and are meant only as a guide to aid in design. Field testing should be performed to find the actual values for your application. RNT ID OD SIZE NO. WALL LBS./FT. MAX.WKG. PSI AT 68°F STD. LENGTHS PART NO. 1/16 3/32 0.120 1/8 1/8 5/32 5/32 0.170 3/16 3/16 3/16 3/16 1/4 1/4 1/4 5/16 5/16 5/16 3/8 3/8 3/8 3/8 3/8 7/16 7/16 7/16 1/8 5/32 0.170 3/16 1/4 7/32 11/32 1/4 5/16 1/4 3/8 7/16 3/8 7/16 1/2 7/16 1/2 9/16 1/2 3/4 7/8 9/16 5/8 9/16 5/8 11/16

Suzuki Hayabusa 2000 - 2005
by nkono 0 Comments favorite 3 Viewed Download 0 Times

Suzuki Hayabusa 2000 - 2005 Engine Protection Cage installation instructions Items included in this kit Cage loop (1each) Side struts (2 each) Extended frame sliders (2 each) Hardware kit (1 each) (contents listed below) M10-1.25 x 70mm bolt (1 each) M10-1.25 x 80mm bolt (1 each) ¼”-20 x 1 ½” bolts (2 each) ¼”-20 x 2” bolts (2 each) ¼”-20 lock nuts (4 each) 3/8”-24 x ¾” bolts (2 each) Flange Bushings (2 each) M10-1.5 x 15 1/2" all thread rod (1 each) M10-1.5 hex nuts (2 each) 1. Follow installation instructions for extended frame sliders. (See page 1) Note: Do not attach delron tips or tighten extended frame sliders until all components are installed. 2. Place the cage loop inside short telescoping tubes on sliders (See fig. G), push the ¼”-20 x 1 ½” bolts through the bolt holes in the telescoping tubes from the outside and start the ¼”-20 lock nuts. Do not tighten lock nuts at this time. 3. Install the left side strut using the all thread rod, flange bushings and hex nuts provided. Slide the following components over one end of the all thread rod in this order: flange bushing marked with "L", side strut marked with "L" and one M10-1.5 hex nut. (See fig A) Slide the all thread rod through the swing arm bolt on the left side of the motorcycle. (make sure the flange bushing slides into the swing arm bolt) On the right side of the motorcycle slide the following components over the all thread rod in this order: flange bushing marked "R", side strut marked "R" and M10-1.5 hex nut. (you may need to hold the left side to ensure it stays in place) 4. Push the bottom of the cage loop towards the rear of the motorcycle while pulling the bottom of the left side strut towards the front until the bolt hole on the side strut meets the threaded hole on the tab welded to the cage loop. Attach the side strut to the outside of the tab on the cage loop with a 3/8”-24 x ¾” bolt. (See fig J) Do not tighten the bolt at this time. Repeat for other side. 5. Once all components are attached tighten all bolts and nuts. Be sure to torque all engine mount bolts to factory specifications. Torque the hex nuts on the all thread stud to 12ft lbs. We recommend using "blue" loctite on the all thread stud to ensure the hex nuts do not vibrate loose. 6. Install delron tips with ¼”-20 x 2” bolts and ¼”-20 lock nuts.

« previous  123456789