SEARCH

Found 5747 related files. Current in page 1

how to remove front axle from 2001 f250 4x4 ford

BYS9063_Form 2359 Tube Replacement.indd - Bryan Boilers

Tube Replacement Instructions: CL/CLM & HECL/HECLM Models Bryan Steam, the originator and leader in the production of flexible tube water and steam boilers for over 90 years, is pleased to provide you with the technical and service information you need to keep your Bryan Boiler running. These instructions will give you the information you need to remove and replace tubes on a CL/CLM or HECL/HECLM Model Bryan Boiler. Here are a few points to consider when inspecting your boiler. 1. Inspect your boiler annually to find and replace bad tubes. 2. These are the two warning signs that a tube is bad: • A knocking sound in the tube bank of the boiler indicates a possibly clogged tube. • A white ash visible along the bottom of a tube or tubes indicates that the tube is getting too hot from reduced water flow. Required Tools for Tube Replacement: 1" tube puller 1" tube driver 50/50 mixture pipe dope and cutting oil 1" paint brush 3 lb. hammer 9/16" socket wrench half round file full round file piece of emery cloth a tool to bend the tube studs (or small socket/ratchet set) ...

Suzuki Hayabusa Gen 2 Upper Fairing Removal.pdf - Hayabusa.oRg

Suzuki Hayabusa Gen 2 Upper Fairing Removal. This can be used to take off the panels to get to the fuse block, Gauge Cluster, changing bulb, anything behind ... Suzuki Hayabusa Gen 2 Upper Fairing Removal. This can be used to take off the panels to get to the fuse block, Gauge Cluster, changing bulb, anything behind the upper cowl. Step 1: Remove these bolts on both sides of the bike. 4mm Hex 2nd Step Remove these plastic pin (both side) by inserting a small flat head screw driver and popping it up. Step 3: Remove this bolt located center and below the triple Tree. Step 4: this piece should easily pop out. Notice that there is another push pin hidden? Step 5: Remove this pin by pushing the center. (Both sides) Suzuki Hayabusa Gen 2 Upper Fairing Removal. This can be used to take off the panels to get to the fuse block, Gauge Cluster, changing bulb, anything behind the upper cowl. Step 1: Remove these bolts on both sides of the bike. 4mm Hex 2nd Step Remove these plastic pin (both side) by inserting a small flat head screw driver and popping it up. Step 3: Remove this bolt located center and below the triple Tree. Step 4: this piece should easily pop out. Notice that there is another push pin hidden? Step 5: Remove this pin by pushing the center. (Both sides)

Suzuki Hayabusa 2000 - 2005
by nkono 0 Comments favorite 3 Viewed Download 0 Times

Suzuki Hayabusa 2000 - 2005 Engine Protection Cage installation instructions Items included in this kit Cage loop (1each) Side struts (2 each) Extended frame sliders (2 each) Hardware kit (1 each) (contents listed below) M10-1.25 x 70mm bolt (1 each) M10-1.25 x 80mm bolt (1 each) ¼”-20 x 1 ½” bolts (2 each) ¼”-20 x 2” bolts (2 each) ¼”-20 lock nuts (4 each) 3/8”-24 x ¾” bolts (2 each) Flange Bushings (2 each) M10-1.5 x 15 1/2" all thread rod (1 each) M10-1.5 hex nuts (2 each) 1. Follow installation instructions for extended frame sliders. (See page 1) Note: Do not attach delron tips or tighten extended frame sliders until all components are installed. 2. Place the cage loop inside short telescoping tubes on sliders (See fig. G), push the ¼”-20 x 1 ½” bolts through the bolt holes in the telescoping tubes from the outside and start the ¼”-20 lock nuts. Do not tighten lock nuts at this time. 3. Install the left side strut using the all thread rod, flange bushings and hex nuts provided. Slide the following components over one end of the all thread rod in this order: flange bushing marked with "L", side strut marked with "L" and one M10-1.5 hex nut. (See fig A) Slide the all thread rod through the swing arm bolt on the left side of the motorcycle. (make sure the flange bushing slides into the swing arm bolt) On the right side of the motorcycle slide the following components over the all thread rod in this order: flange bushing marked "R", side strut marked "R" and M10-1.5 hex nut. (you may need to hold the left side to ensure it stays in place) 4. Push the bottom of the cage loop towards the rear of the motorcycle while pulling the bottom of the left side strut towards the front until the bolt hole on the side strut meets the threaded hole on the tab welded to the cage loop. Attach the side strut to the outside of the tab on the cage loop with a 3/8”-24 x ¾” bolt. (See fig J) Do not tighten the bolt at this time. Repeat for other side. 5. Once all components are attached tighten all bolts and nuts. Be sure to torque all engine mount bolts to factory specifications. Torque the hex nuts on the all thread stud to 12ft lbs. We recommend using "blue" loctite on the all thread stud to ensure the hex nuts do not vibrate loose. 6. Install delron tips with ¼”-20 x 2” bolts and ¼”-20 lock nuts.

Full System Instructions - Two Brothers Racing

Installation Instructions 1. Make sure the bike is completely cool before starting the installation. Make sure the bike is secure on a centerstand or ideally a service lift. 2. Remove rear lower cowling. 3. Remove OEM mufflers. V.A.L.E. TM 2008 Suzuki V a r i a b l e A x i s L o c k i n g E x h a u s t HAYABUSA V.A.L.E.™ Complete Exhaust System with M-2 Canister Part # 005-1930106V / 005-1930107V / 005-1930108V 8. 9. 4. The horn should also be removed for more radiator clearance. Install the TBR head pipes. (Each piece is labeled for proper postioning). From Left to Right, install head pipes 1, 2, 3, and then 4. Use the OEM gasket between the head pipes and cylinder head. Remove cowling from both the left and right sides. “M” Parts List Qty. Description 1 15” Muffler Canister 1 4-2-1 Slip-on Tube 1 4-2-1 Header Assembly 1 HARDWARE KIT 1 8x55mm Socket Head Flat Bolt (Black) 6 80mm Springs 1 8x16mm Flange Bolt 4 6x14mm Socket Head Cap Screw 1 Barrel Clamp 1 5mm Long Handle Ball End Hex Wrench 4 6mm Split Lock Washer 2 TBR Script Logo Yellow Decal 4” “1” Muffler Slip-tube Part Number Varies 005-19301S 005-19301HK 005-193-3C 005-SHF855B 005-S-80 005-FB816 005-SH814 005-27-66MSH 005-9-18610 005-WL6 015-10208-A 5. “2” “3” “R” “4” Remove radiator braces. 6. “L ” Remove O2 sensore from OEM head pipe. 10. Install the collectors to the bottom of the head pipes. The collectors are labeled “L for left and “R” for Right. ” IMPORTANT - PLEASE READ CAREFULLY We recommend that this performance part be installed by a qualified motorcycle technician. If you have any doubts as to your ability to install this performance part, please consult with your local motorcycle dealer. Read all instructions first before starting installation. Make sure the motorcycle and exhaust system are completely cool before starting the installation. Also, make sure the bike is secure on a centerstand or ideally a service lift during installation. Be sure to save all stock components for possible use later.

RCC Turbos - Stage 1 Turbo Install - Suzuki Hayabusa - Gen 1

RCC Turbos - Stage 1 Turbo Install: Suzuki Hayabusa (Gen 1) • Preparation/Disassembly: Remove the seat. Disconnect negative terminal on the battery. Drain the fuel tank. Remove the fuel tank. Remove the stock fuel pump from the tank. Remove the air box. Remove the MAP sensor and temperature sensor from the air box. Remove left and right side fairings. Drain engine oil. Drain engine coolant. Remove the oil filter Remove the oil restrictor, behind the filter. Remove the oil cooler lines. Remove the radiator and oil cooler, as one unit, leaving only the bracket/support for radiator (before reinstalling the radiator please remove all the tabs along the bottom of the radiator). Remove the entire exhaust system. Remove the PAIR system. Remove the oil pan from the engine. • Sensor Bracket Modification: On the left hand side of bike, on the inside of the frame, you will see a bracket, with a plastic vacuum canister, vacuum control solenoid valve, atmospheric pressure sensor, and some vacuum lines, with a check valve in the vacuum line. Please remove this entire bracket, eliminate all the vacuum lines, the plastic canister, and the control solenoid valve, and also cut off the metal tab that held the vacuum canister. Then reinstall this bracket with only the atmospheric pressure sensor, and plug the wires back in. • Tap/plug PAIR System Holes: Tap the four small PAIR system holes, above the exhaust ports, with an M6 x 1.0 tap. Install the four small M6 screws into the exhaust holes after tapping them. • Modify the Oil Pan: Drill a ¾” hole on the left side of the oil pan. Use thread sealant on the washer, and red Loctite on the threads. Make sure the sealing washer is against the inside of pan, then the stainless flat washer, then the nut. Once the fitting is installed, reinstall the oil pan. • Install Header/Turbo/Oil Lines/Exhaust: Install the header and turbo as a unit, but with the bolts loose. Use four of your original header bolts on the top of the turbo header (Allen head). Use the four new bolts on the bottom row of the header (M8, 10mm flange head). PLEASE NOTE! After installing the dump pipes and waste gate, the nipple on the top of the waste gate remains open, and no hose gets installed on the top fitting. The top fitting is used for boost control on Stage 2 and higher end kits. It is not used on Stage 1 kits.

Functional Resume Sample
by Deppony 0 Comments favorite 1 Viewed Download 0 Times

Functional Resume Sample John W. Smith 2002 Front Range Way Fort Collins, CO 80525 jwsmith@colostate.edu Career Summary Four years experience in early childhood development with a diverse background in the care of special needs children and adults. Adult Care Experience Determined work placement for 150 special needs adult clients. Maintained client databases and records. Coordinated client contact with local health care professionals on a monthly basis. Managed 25 volunteer workers. Childcare Experience Coordinated service assignments for 20 part-time counselors and 100 client families. Oversaw daily activity and outing planning for 100 clients. Assisted families of special needs clients with researching financial assistance and healthcare. Assisted teachers with managing daily classroom activities. Oversaw daily and special student activities. Employment History 1999-2002 1997-1999 1996-1997 Counseling Supervisor, The Wesley Center, Little Rock, Arkansas. Client Specialist, Rainbow Special Care Center, Little Rock, Arkansas Teacher’s Assistant, Cowell Elementary, Conway, Arkansas Education University of Arkansas at Little Rock, Little Rock, AR • • • • BS in Early Childhood Development (1999) BA in Elementary Education (1998) GPA (4.0 Scale): Early Childhood Development – 3.8, Elementary Education – 3.5, Overall 3.4. Dean’s List, Chancellor’s List

Savage Gulf Trail Map - Friends of South Cumberland State ...

GREETER TRAIL General Description: This short trail connects the Alum Gap Camp Area with the Greeter Falls Area. The first mile is an easy plateau top walk with the last half mile a moderate gorge walk. The falls are sometimes dry but there is always a cool water hole at the bottom. Miles Trail Description: 0.0 Trail begins at Alum Gap, 1 mile down Big Creek Gulf Trail from camping area. Big Bluff Overlook to left. 0.2 1.0 Suspension Bridge across Boardtree Creek, junction of Greeter Falls Loop Trail. 1.3 Trail splits—left is Lower Falls (50’ high) and plunge pool; right is Upper Falls (15’ high) Greeter Falls. 1.4 General Description: This long, difficult trail is designed to accommodate extended trips. Half the length is the Collins River Gorge and the other half is along the east rim. The gorge section has many beautiful geological features. Trail is closed during part of winter due to dangerous ice buildup at 6.3. Miles Trail Description: Trail begins atop Peak Mountain at the end of the South Rim Trail and the Stage 0.0 Road Historic Trail. 0.5 Blue Branch Overlook to the right, an outstanding view of a short tributary gorge and the main gulf. Ford of Blue Branch; thick Rhododendron growth. 1.1 Horsepound Point Overlook to right. 1.8 2.4 Standing Rock Overlook to right. 2.6 Collins River Overlook to right. 3.0 A small stream is forded with the remains of an old moonshine still visible to the left. Another still site to the left on a larger stream. 4.7 4.9 Collins East Camp Area to left. 5.3 Collins River is crossed on a 100’ suspension bridge, above huge boulders. 6.2 Collins West Camp Area on trail straight ahead; main trail to right. Camp area is on the mountaintop and has the best overlook along the trail—Rocky Point. There is also a parking area from 55th AVE off HWY 108, 1/4th mile out access trail from campsite. 6.3 The spectacular triple waterfall of Rocky Mountain Creek, a huge overhang, and creek ford. A large mound of fallen rocks and exceptionally large Chestnut Oak Tree to trail 6.8 right; start of descent.....

Protect Your PC Using Optimodefender Antivirus from all Virus and Malicious worms

Optimodefender is a latest and efficient Antivirus Software, which are provides a best solution for your personal computer, laptop & mobile from related to adware, Spyware, malware,Trojan viruses, Red worms, and any other unwanted malicious worms. It's latest and verified antivirus software that easily detect and remove your thread online from your PC and safe your system from any other unwanted virsus. You can more information and take help online from them by dialing their toll free number 1-646-688-3079 and also can visit from website.

Map of Selected Tennessee Historic Sites - TN.gov

Map of Selected Tennessee Historic Sites. Photographs and brief descriptions are on the following pages. Tennessee Blue Book. A History of Tennessee. 528 ... 1. Victorian Village, Memphis 2. Hunt/Phelan House, Memphis 3. Graceland, Memphis 4. Chucalissa Prehistoric Indian Village, Memphis 5. Beale Street Historic District, Memphis 6. Alex Haley Home and Museum, Henning 7. Reelfoot Lake, Tiptonville 8. Ames Plantation, Grand Junction 9. Pinson Mounds State Park, Pinson 10. Shiloh National Military Park, Shiloh 11. Natchez Trace Parkway, Hohenwald 12. James K. Polk Home, Columbia 13. Jubilee Hall of Fisk University, Nashville 14. Parthenon, Nashville 15. Belle Meade Plantation, Nashville 16. The Hermitage, Nashville 17. Tennessee State Capitol, Nashville 18. Ryman Auditorium, Nashville 19. Mansker's Station & Bowen-Campbell House, Goodlettsville 20. Jack Daniel's Distillery, Lynchburg 21. Cordell Hull Birthplace and Museum, Byrdstown 22. Chickamauga/Chattanooga National Military Park, Chattanooga 23. Rhea County Courthouse, Dayton 24. York Grist Mill/Home of Alvin C. York, Pall Mall Tennessee Blue Book Historic Sites Locations #1 Victorian Village Memphis, TN 38103 (901) 526-1469 In the area of Adams Avenue in Memphis, a number of landmark 19th century homes have been saved from destruction by interested citizens. The Boyd-Massey-Maydwell house likely is the oldest of those pictured below. A neo-classic cottage at 664 Adams, it is owned by the City of Memphis and used by the City Beautiful Commission. The Harsson-Goyer-Lee house at 690 Adams originally was a small four-square cottage built by William Harsson, a lath mill operator. It was expanded in 1855 by his son-in-law, Charles Wesley Goyer, who added the present threestory front in 1871. The house was sold in 1890 to steamboat empire owner James Lee Jr. whose Mallory-Neely house, 1854-1883 Mollie Fontaine Taylor house, 1886 Elias Lowenstein house, 1890 Harsson-Goyer-Lee house, 1848-1873 Woodruff-Fontaine house, 1870 529

The Ministry of Defence - Makita UK
by januar 0 Comments favorite 2 Viewed Download 0 Times

The Ministry of Defence Makita and the MoD For almost five years Makita have been the sole supplier of powertools to the Ministry of Defence The Royal Engineers regiment recently took delivery of a further 500 Makita DCS5030 chainsaws, spares and specially designed rucksacks for carrying the lightweight chainsaws in rugged terrain. The British military uses chainsaws to clear wooded areas to set up forward operating bases, helicopter landing zones and for ground clearance to provide a clear line of sight for security and safety in hostile locations. The Royal Engineers are responsible for a broad range of facility logistics and with military operations of all descriptions, the Corps are regularly required to quickly establish new operation locations, sometimes in rural territory. It maybe necessary to fell trees quickly and safely to allow vehicle or helicopter access and the Makita DCS5030 50cc 3.8hp chainsaw is ideal for this type of use. It weighs Makita chainsaws and disc cutters are also on the front line with the British Navy. The Royal Navy is also equipped with Makita chainsaws, mainly for use in their valuable roll in disaster relief as a naval ship is often the first available outside assistance for a location hit by tornados, flooding, earthquake or tsunami.

« previous  123456789