SEARCH

Found 2275 related files. Current in page 1

how to install harmonic balancer on 99 dodge durango

REASONS TO GO FOR VINYL WINDOWS REPLACEMENT

Vinyl windows are a great replacement option because they are easy to install. Moreover these widows prove to be energy efficient fixtures that regulate the room temperature well as well as are a cost effective interior decor option. http://www.thermalwindowsdfw.com/

HYDRO-BOOST BRAKE BOOSTER Installation Guide REMOVING ...

930394-52 Rev. 12/22/05 4:21 PM Page 1 HYDRO-BOOST BRAKE BOOSTER Installation Guide 4. Enable ignition system and start the engine. 7. Check fluid level and add fluid if needed. 5. Turn the steering wheel from stop to stop several times. Do not hold it against the stop. 8. Again start engine and turn steering wheel from stop to stop several times (avoid turning fully against stops as much as possible). Recheck fluid level and fill as required. If there is evidence of fluid foaming, turn off engine and wait an hour for foam to clear. Lacks Power Assist Booster or Pedal Chatters X X X Looses Reserve Pressure HAIRPIN CLIP BRAKE PEDAL PUSHROD X PUSHROD SPACER PUSHROD BUSHING 6. Loosen the locknuts holding the HydroBoost unit to the firewall and then slide the linkage, nylon washers and brushing off the pedal pin. 4. Disconnect all hydraulic lines from the Hydro-Boost unit (pressure, steering gear and return lines). PRESSURE LINE MASTER CYLINDER HYDRO-BOOST SPACER X X X BRAKE LINES DO NOT DISCONNECT JDA356 STOP-LIGHT SWITCH 3. Separate the master cylinder from the mounting studs. N OT E : DO NOT disconnect the brake lines from the master cylinder unless necessary to avoid bending or damaging those lines. X Pedal Returns Slowly 5. Disconnect the Hydro-Boost pushrod linkage from the brake pedal. NOT E : It may be necessary to remove the stoplight switch from the brake pedal. If so, unplug the stoplight switch wires, remove the hairpin retainer, slide the switch off the pedal pin just far enough to permit removing the switch from the pin. Do not damage the switch. N OT E : Before beginning work, be sure vehicle is parked in a level area and that wheels are chocked to prevent unintentional movement. Read all of these instructions before attempting to install the HydroBoost unit. 2. Remove the nuts attaching the master cylinder to the Hydro-Boost unit.

BPI 10-06 Temporary reduction in power brake ... - Raybestos Brakes

No. BPI 10-06 Subject: Temporary reduction in power brake assist in extreme cold weather Vehicles Involved: Models: 2009 BUICK ENCLAVE 2009 CHEVROLET TRAVERSE 2009 GMC ACADIA 2009 SATURN OUTLOOK From 9J100008 From 9S100002 From 9J100016 From 9J100003 to to to to 9J190898 9S143268 9J190899 9J190888 Condition: If the brake check valves are NOT installed correctly, an increased amount of brake pedal effort will be required to obtain brake function, and the brake assist system will NOT perform as designed. Repair: Replace the first design brake booster vacuum hose check valve (1) with a second design brake booster vacuum hose check valve (2). An arrow on the second design check valve indicates the vacuum draw direction (3). 1. Remove the fuel injector sight shield (engine cover) from the engine. 4400 Prime Parkway McHenry, IL 60050  (815) 363-9000 Determine where the two brake booster vacuum hose check valves are located. Refer to callouts 1 and 2 in the illustration 2. Release the quick connect (4) from the power brake booster auxiliary pump (3). 3. Remove the protective wrap (5) from the brake booster vacuum hose to locate check valve # (1). 4400 Prime Parkway McHenry, IL 60050  (815) 363-9000 4. Remove the check valve (1) from the brake booster vacuum hose that routes to the power brake booster auxiliary pump (3). 5. Remove the check valve (2) from the brake booster hose that routes to the intake manifold vacuum port (6). Note If necessary, a small amount of denatured alcohol can be used as an assembly aid for installing the vacuum hose to the manifold vacuum port. Do not use soap. 6. Install a new check valve (1) to the brake booster hose that routes to the power brake booster auxiliary pump (3). Ensure the arrow on the check valve (1) ...

Chase Bays 240sx Booster Delete Brake Line ... - Chase Bays, Inc

Chase Bays 240sx Booster Delete Brake Line Relocation Kit Install Guide What is included? •(1) Stainless steel engine bay hard line •(6) Stainless braided/Teflon coated crimped brake lines •(1) -­‐3AN Bulkhead Tee fitting (Gold in color) •(1) Female -­‐3AN Tee Fitting w/ male fitting on leg (Black in color) •(2) Straight -­‐3AN Bulkheads (1) 90 degree -­‐3AN Bulkhead (4) Bulkhead nuts •(1) -­‐3AN tube nut (for rear line) •(1) -­‐3AN tube sleeve (for rear line) •(1) Wilwood Proportioning Valve with -­‐3AN male fittings •Uninstall all OEM Brake hard lines and Booster/Master Cylinder. •Install your Chase Bays Brake Booster Delete Kit. Start with drilling your engine bay hole. Install the hard line to help line up the hole correctly.

Safety Recall No. 983 Brake Booster Vacuum Hose

Safety Recall No. 983 Brake Booster Vacuum Hose Models 2000-2001 (PL) Dodge and Plymouth Neon NOTE: This recall applies only to the above vehicles equipped with a: Ø 2.0L engine (“C” in the 8th VIN Position) built through March 21, 2001 (MDH 0321XX) or a Ø 2.0L High Output engine (“F” in the 8th VIN Position) built through April 11, 2001 (MDH 0411XX). IMPORTANT: Some of the involved vehicles may be in dealer new vehicle inventory. Federal law requires you to stop sale and complete this recall service on these vehicles before retail delivery. Dealers should also consider this requirement to apply to used vehicle inventory and should perform this recall on vehicles in for service. Involved vehicles can be determined by using the DIAL VIP System. Subject The brake booster vacuum hose on about 350,000 of the above vehicles may swell due to oil contamination and become disconnected. A disconnected hose could cause a loss of power brake assist and an increase in engine idle speed. This can increase stopping distance and cause an accident without warning. Repair The brake booster vacuum hose must be replaced. © Copyright 2001, DaimlerChrysler Corporation, All Rights Reserved Safety Recall No. 983 -- Brake Booster Vacuum Hose Page 2 Parts Information Each dealer to whom vehicles in the recall were invoiced (or the current dealer at the same street address) will receive enough Brake Booster Vacuum Hoses to service about 10% of those vehicles. Dealers should determine which brake booster vacuum hose is required for each vehicle at the time appointments are scheduled to assure that the correct part is available when the customer arrives. The vacuum hose for the vehicle to be serviced may be determined by: Ø Using the part code in the third column of the VIN list along with the following table (involved dealers); Ø Using the VIN and part number list electronically transmitted to DIAL System Function 53 (involved dealers); or...

SECTION 205-00 Driveline System — General Information

GENERAL PROCEDURES Driveshaft Runout and Balancing Special Tool(s) Dial Indicator Gauge with Holding Fixture 100-002 (TOOL-4201-C) or equivalent Mastertech® Series MTS 4000 Driveline Balance and NVH Analyzer (Vetronix) 257-00018 or equivalent Driveshaft Inspection NOTE: Driveline vibration exhibits a higher frequency and lower amplitude than high-speed shake. Driveline vibration is directly related to the speed of the vehicle and is noticed at various speeds. Driveline vibration can be perceived as a tremor in the floorpan or heard as a rumble, hum or boom. NOTE: Refer to Specifications in this section for all runout specifications. 1. NOTE: Do not make any adjustments before carrying out a road test. Do not change the tire pressure or the vehicle load. Carry out a visual inspection of the vehicle. Operate the vehicle and verify the condition by reproducing it during the road test. • 2. With the vehicle in NEUTRAL, position it on a hoist. For additional information, refer to Section 100-02. • 3. The concern should be directly related to vehicle road speed, not affected by acceleration or deceleration or could not be reduced by coasting in NEUTRAL. The driveshaft should be kept at an angle equal to or close to the curb-weighted position. Use a twin-post hoist or a frame hoist with jackstands. Inspect the driveshaft for damage, undercoating or incorrectly seated U-joints. Rotate the driveshaft slowly by hand and feel for binding or end play in the U-joint trunnions. Remove the driveshaft. For additional information, refer to Section 205-01. Inspect the slip yoke splines for any galling, dirt, rust or incorrect lubrication. Clean the driveshaft or install new U-joints as necessary. Install a new driveshaft if damaged. After any corrections or new components are installed, recheck for the vibration at the road test speed.

driveshaft series 6Q – 175 – 250 - SPX Cooling Technologies

driveshaft series 6Q – 175 – 250 I N S TA L L AT I O N - O P E R AT I O N - M A I N T E N A N C E M92-1442B I SSU E D 4/2013 R EAD AN D U N D E R STAN D TH I S MAN UAL PR IOR TO OPE RATI NG OR S E RVICI NG TH I S PROD UCT. Before installing the driveshaft, be sure the motor and Geareducer are on level bases and that their shafts are in reasonable alignment. Note match numbers on the driveshaft flanges and remove the yokes. Coat the motor shaft and Geareducer shaft with “Thred-Gard” (Crane Packing Co.) or similar lubricant. Place the key halfway in motor and Geareducer shafts, then install yokes as shown in Figure 4. Use a rubber mallet or wood block when tapping yokes to prevent damage. Tighten each yoke set screw against key. Align match numbers on tube and yoke flanges and bolt the tube and flange assembly to the Geareducer yoke while supporting the motor end of the tube and flange assembly. Progressively tighten bolts to 60 ft·lbƒ (82 N·m) torque. Slide the motor so that motor yoke can be bolted to the tube and flange assembly without pushing or pulling on the bushings. Align match numbers and bolt the motor yoke to the tube and flange assembly. Progressively tighten bolts to 60 ft·lbƒ (82 N·m) torque. The distance between tube and yoke flanges should be as shown in Figure 4.

XT100-08am Driveshaft Vibration.pdf - JagRepair.com - Jaguar ...

X-TYPE DATE 05/04 Amended 09/04 XT100-08 TECHNICAL BULLETIN SERVICE Driveshaft Vibration – Diagnostic Method – Repair MODEL 2002-04 MY X-TYPE VIN C00001-E02938 Remove and destroy Bulletin XT100-08, dated 05/04. Replace with this Bulletin. Revisions are marked with a bar and in bold text. Issue: A new procedure has been developed for use after the WDS Vehicle Vibration Analyzer (VVA) has confirmed a vehicle vibration. Action: After a driveshaft vibration has been confirmed using WDS VVA, follow the workshop procedure outlined below. WORKSHOP PROCEDURE Note: There is no Labor Time Allowance to carry out road test diagnosis. Jaguar recommends a claim of 0.50 hrs. as straight time for VVA. Warning: Driveshaft bolts are one-time use only. Use new bolts for the final repair. Existing bolts may be reused throughout the diagnostic procedures. Raise vehicle on twin-post lift. Check for alignment of the green line on the rear differential flange with white paint spot on the rear of the driveshaft. If not aligned continue from step 3; if aligned continue from step 16. Remove the rear driveshaft joint to rear differential flange bolts and links where accessible. Rotate the driveshaft and remove the remaining rear driveshaft joint to rear differential flange securing bolts and links. Displace driveshaft from the rear differential flange. Remove and discard the gasket from the rear differential flange (where installed). Clean the mating faces. Install a new gasket to the rear differential flange, if previously installed. NOTE: THE INFORMATION IN TECHNICAL BULLETINS IS INTENDED FOR USE BY TRAINED, PROFESSIONAL TECHNICIANS WITH THE KNOWLEDGE, TOOLS, AND EQUIPMENT TO DO THE JOB PROPERLY AND SAFELY. IT INFORMS THESE TECHNICIANS OF CONDITIONS THAT MAY OCCUR ON SOME VEHICLES, OR PROVIDES INFORMATION THAT COULD ASSIST IN PROPER VEHICLE SERVICE. THE PROCEDURES SHOULD NOT BE PERFORMED BY “DO-ITYOURSELFERS.” DO NOT ASSUME THAT A CONDITION DESCRIBED AFFECTS YOUR CAR. CONTACT A JAGUAR RETAILER TO DETERMINE WHETHER THE BULLETIN APPLIES TO YOUR VEHICLE. Date of issue 05/04 Amended 09/04

FLEXIBLE HOSE DATA SHEET_1 - EasyFlex

FLEXIBLE HOSE DATA SHEET EASYFLEX Flexible Sprinkler Drops are designed to significantly reduce labor and installation costs. By eliminating the need for pipe cutting and midline connections, you save valuable time and money. EASYFLEX Flexible Sprinkler Drops can be installed on almost any suspended commercial ceilings. The flexible hose allows for fast installation while our innovative brackets are simple and easy to install. Brackets for T-Bar ceiling grids, wall mount, metal studs, woodbeams, open hat channels, industrial ducts, and cleanrooms. No special tools required, and installation completed in a few easy steps. Flexible hoses come in braided or unbraided types, from 24” to 72” in length. EASYFLEX Flexible Sprinkler Drops Appliance Standards National Fire Protection Association (NFPA): - NFPA 13: Standard for the Installation of Sprinkler Systems - NFPA 13D: Standard for the Installation of Sprinkler Systems in One and Two-Family Dwellings and Manufactured Homes - NFPA 13R: Standard for Installation of Sprinkler Systems in residential Occupancies up to and including four stories in height American Society for Testing and Methods (ASTM): - ASTM C635: Standards specifications for the manufacture, performance, and testing of metal suspension systems for acoustical tile and lay-in panel ceilings...

Suzuki Hayabusa 2000 - 2005
by nkono 0 Comments favorite 3 Viewed Download 0 Times

Suzuki Hayabusa 2000 - 2005 Engine Protection Cage installation instructions Items included in this kit Cage loop (1each) Side struts (2 each) Extended frame sliders (2 each) Hardware kit (1 each) (contents listed below) M10-1.25 x 70mm bolt (1 each) M10-1.25 x 80mm bolt (1 each) ¼”-20 x 1 ½” bolts (2 each) ¼”-20 x 2” bolts (2 each) ¼”-20 lock nuts (4 each) 3/8”-24 x ¾” bolts (2 each) Flange Bushings (2 each) M10-1.5 x 15 1/2" all thread rod (1 each) M10-1.5 hex nuts (2 each) 1. Follow installation instructions for extended frame sliders. (See page 1) Note: Do not attach delron tips or tighten extended frame sliders until all components are installed. 2. Place the cage loop inside short telescoping tubes on sliders (See fig. G), push the ¼”-20 x 1 ½” bolts through the bolt holes in the telescoping tubes from the outside and start the ¼”-20 lock nuts. Do not tighten lock nuts at this time. 3. Install the left side strut using the all thread rod, flange bushings and hex nuts provided. Slide the following components over one end of the all thread rod in this order: flange bushing marked with "L", side strut marked with "L" and one M10-1.5 hex nut. (See fig A) Slide the all thread rod through the swing arm bolt on the left side of the motorcycle. (make sure the flange bushing slides into the swing arm bolt) On the right side of the motorcycle slide the following components over the all thread rod in this order: flange bushing marked "R", side strut marked "R" and M10-1.5 hex nut. (you may need to hold the left side to ensure it stays in place) 4. Push the bottom of the cage loop towards the rear of the motorcycle while pulling the bottom of the left side strut towards the front until the bolt hole on the side strut meets the threaded hole on the tab welded to the cage loop. Attach the side strut to the outside of the tab on the cage loop with a 3/8”-24 x ¾” bolt. (See fig J) Do not tighten the bolt at this time. Repeat for other side. 5. Once all components are attached tighten all bolts and nuts. Be sure to torque all engine mount bolts to factory specifications. Torque the hex nuts on the all thread stud to 12ft lbs. We recommend using "blue" loctite on the all thread stud to ensure the hex nuts do not vibrate loose. 6. Install delron tips with ¼”-20 x 2” bolts and ¼”-20 lock nuts.

« previous  123456789