SEARCH

Found 703 related files. Current in page 1

gambar animasi bergerak screw rotary compressor

Local Dentist Karl Jobst Offers Huge Donation to Rotary Lobsterfest Fundraiser

(1888 PressRelease) Dr Karl Jobst donation includes addition of teeth whitening and Botox to a multi-business spa package.

TRANSMISSION REMOVAL & INSTALLATION - A/T ... - LIL EVO

AUTOMATIC FWD MODELS REMOVAL 1) Remove battery and battery tray. On 3000GT, remove undercover(s). On Eclipse turbo, drain and remove intercooler. On all models, remove air cleaner and case. Raise and support vehicle. Remove wheels. Disconnect control cables at transaxle. Drain transaxle fluid. 2) On Mirage 1.6L, disconnect tension rod. On all models, disconnect neutral safety switch connector, oil cooler hoses and electrical connectors from transaxle. Disconnect speedometer cable and throttle control cable (if equipped). Remove starter motor. 3) On Galant models with electronically controlled suspension, remove air compressor and bracket. Disconnect front height sensor rod at lower control arm. 4) On all models, remove upper transaxle-to-engine bolts. Remove engine undercover (if equipped). On all models, remove drive axle shafts. See FWD AXLE SHAFTS article in DRIVE AXLES. Separate lower control arms from struts for access to axle shafts (if necessary). 5) Remove front exhaust pipe (if necessary). On Eclipse 4WD, Galant 4WD and 3000GT, remove right member and gusset. On 4WD models, separate transfer assembly from transaxle. Reference mark transfer assembly-to-drive shaft and remove transfer assembly. 6) On all models, remove transmission inspection (dust) cover. Place index mark on torque converter and drive plate for reassembly reference. Remove torque converter-to-drive plate bolts. Push torque converter away from engine into transaxle. 7) Support transaxle with jack. Remove transaxle mounts bolts, mounting brackets and remaining transaxle-to-engine bolts. Slide transaxle assembly to right and lower to remove. CAUTION: Ensure torque converter is fully seated in transaxle before installation. Always install new snap rings on inner constant velocity joints.

3.0 L V6 - VINS [H,J,K] - dairally.net

Removal (Diamante) 1) Remove hood. Drain cooling system. Remove radiator. Release fuel system pressure. See FUEL PRESSURE RELEASE. Disconnect negative battery cable. Drain engine oil and transaxle oil. Remove front exhaust pipe. Remove transaxle assembly. See appropriate CLUTCHES or TRANSMISSION SERVICING article. 2) Disconnect accelerator cable, brake booster vacuum hose, fuel supply and return lines, and heater hoses. Disconnect EGR temperature sensor (if equipped). Unplug vacuum hose connector. Remove drive belts. Remove power steering pump and A/C compressor, leaving hoses attached. 3) Unplug all harness connectors. Remove bolt from body ground connection. Disconnect alternator wiring inside relay box. Remove relay box and engine wiring harness connection. On models with ABS, remove radiator overflow tank and bracket. 4) Attach engine hoist. Raise engine enough to take weight from mounts. Remove engine mount bracket. Remove damper. Remove rear roll stopper bracket mount bolt. Remove front roll stopper bracket mount bolt. Carefully lift engine from car. Installation (Diamante) To install, reverse removal procedure. Install engine mount bracket so that arrow points away from engine, toward body. Install new "O" rings on fuel lines. Install new exhaust gaskets and nuts. Adjust throttle cable. See TORQUE SPECIFICATIONS TABLE at the end of this article. Replenish fluids. CAUTION: DO NOT allow foreign material into turbocharger air intake hoses or pipes.

H735 Syntetic Flexible Hose - Johnson Controls Inc.

The synthetic hoses consist of a seamless PA compound inner layer reinforced with a braided layer of high performance synthetic fibre. This reinforcement is protected by an oil, weather and abrasion resistant Polyester Elastomer Compound. The standard assembly length is 0,9 meter with one straight and one elbow 90 degree hose fitting. The fitting connection is 1/4” metal tube with 7/16”-20 UNF swivel nut connection suitable for 1/4” SAE male flare. Other lengths and/or fitting connections configurations (Style 50, 51 straight or elbow) are available on request (quantity orders only). Features zz Very flexible zz Low minimum bend radius (30 mm) zz One straight and one 90° elbow pressure connection zz Polyester Elastomer Compound construction zz High pressure safety ratio zz Low effusion Application These synthetic hoses are designed for pressure measuring connections. They provide, for example, a very flexible connection between a refrigerant compressor and pressure controls. The hoses can be used for all non-corrosive refrigerants including R134a, R22, R404a, R407c and R410A with pressures within the maximum pressure range of the hose. Hoses are tested with common compressor oils in combination with above mentioned refrigerants. Ordering Codes Pressure Connection Fitting Connection Length (cm) H735AA-30C H735AA-40C 40 H735AA-50C Aditional Features 30 50 H735AA-70C H735AA-90D Straight x 90° elbow 1/4” metal tube with 7/16”-20 UNF swivel nut connection suitable for 1/4” SAE male flare

G-H series horizontal grinding machines - Star SU

The new G-H series of grinding machines for gears, shafts, worms, rotors and screws. One universal solution adapted to your specific application – now for workpieces up to 500 mm in diameter Based on the widely acclaimed S 375 G, the new G-H series presents numerous enhanced features and extends the traditional series to include new model versions. Although Samputensili grinding machines are based on a modular design concept, we craft each and every machine with a wide range of options to suit your individual needs, guaranteeing you the efficient manufacturing of top quality parts. This modular, extremely versatile and universal series is ideally suited to single pass creep feed profile grinding of external spur and helical gears, crown gears, shafts, worms, rotors and screw threads. Optionally it is also possible to grind spur or helical internal gears. Owners of a GT version also add generating grinding to their process capabilities. We offer you an ad hoc solution for any of the above applications so that your machine is constructed with the right options for you. All machines are then supported by special software packages, translating our know how into your manufacturing success.

TECHNICAL INFORMATION - Tool Parts Direct

CONCEPTION AND MAIN APPLICATIONS 225mm Break system and Large protector have been provided for the case of Kick Back. Also Auto Oil-feeding system for better lubrication of chain blade. These are designed to conform to the safety standards in developted countries. m 60m m B:7 5m 4N B:79 501 6N 501 Specifications Voltage(V) 100 115 200 220 230 240 Current(A) Frequency(Hz) Consumed power(W) 14 50-60 1300 12 50-60 1300 7 50-60 1300 6.5 50-60 1300 6 50-60 1300 6 50-60 1300 Chain blade speed Effecting cutting 5014NB capacity 5016NB 5014NB Weight 5016NB Cord length Standard 230mm Models No. New Tool Rated output(W) 770 770 770 770 770 770 Max. output(W) 1600 1600 1600 1600 1600 1600 400 m/min. 340 mm 375 mm 6 kg 6.3 kg 5m equipment Oil vessel(Turbine oil #200, 100 cc contained) Guide bar case Box wrench 13 Minus screw driver 6(for adjusting the chain cutter) File The standard equipment for the tools shown may differ form country to country Features and benefits 1. Brake for instantaneously stopping You can operate without anxiety since the built-in bake unit allows the chain cutter motion to stop within 0.1 sec. after the brake lever has been activated. 2. Automatic oil-feeding system The oil pump motion will start to lubricate the chain blade simultaneously on starting of the motor operation, thereby the extension of the chain cutter can be minimized to prolong the service life of the guide bar. 3. Safety design for each section The large protector and the safety shape of the handle are designed to conform to the various safety standards in the main countries throughout the world. 4. Guide bar mounted with the sprocket The sprocket mounted on the edge of the guide bar allows the chain blade to run smoothly and the service life of the guide bar to be extended further. Capacities Since this machine’s motor has the same characteristics and reduction gear ratio as the ones of #5014B, the cutting efficiency etc. is the same.

Suzuki Hayabusa Ram Air Seals - Schnitz Racing

Part Number CT1001 These instructions are written to be comprehensive and detailed to make the installation of this product go as smoothly as possible. No instructions can be a substitute for the mechanical experience necessary to properly complete this project. Therefore, if after reviewing this document you have any doubts about your skills or experience we strongly urge you to seek professional assistance. 1999-2007 Models: Remove seat and raise the fuel tank. Remove airbox and air filter. Cover the throttlebodies with a clean towel or rag to prevent any debris from entering. Remove foam from airbox inlets and remove the raise lip with a hot knife and/or rotary tool. Make sure the ram air sleeves slide easily onto the inlets. Clean the airbox with a low pressure air gun and remove all debris. Apply Permatex Silicon to the beginning and the outside (not inside where the air flows) and slide the sleeve onto the air inlet tubes. Immediately reinstall the airbox onto the engine and tighten all fasteners. Slide the sleeve towards the frame until they touch and align them so they are flush. Allow the Permatex to dry. Roll the rubber seals onto the frame so the gap is covered. A small screwdriver is helpful to roll the bottom. Reinstall the air filter, fuel tank, and seat.

Suzuki Hayabusa Early v5.0.pub - Clearwater Lights

Suzuki Hayabusa 1999-2007 Glenda LED Light Kit (Dimmable) Patent Pending The Clearwater Company 2546 Mercantile Dr. Ste B Rancho Cordova, CA 95742 P:916.852.7029 F:916.852.9410 www.clearwaterlights.com Please be sure to read our instructions thoroughly before attempting installation. Step 1: Parts List and Bike Preparation • • • Check Parts list supplied with your kit to be sure all parts are handy. Contact us at (916) 852-7029 if something is missing. Park the motorcycle on hard pavement or concrete to insure the bike will be stable during the installation. If you can mount the bike on a stand with tie-down straps, this will help secure the motorcycle Follow the manufacturers guidelines for disconnecting the battery. This is important to prevent damage to the electrical system. Note: Clearwater lights include a very high quality means of connecting to the motorcycle’s electrical system. “Posi” devices made by Posi-Products are used to securely and safely make electrical connections on the bike. You can view instructions on the proper installation of the Posi-Products at http://www.posi-lock.com. They simply screw together and mate the wires. We suggest keeping your lights on all the time, we do not furnish an “on-off” switch. It is important to be sure that the wire you use will turn off when the bike is turned off. Otherwise, you will end up with a dead battery. Nobody likes that.

SBMPTN 2013 Biologi - Bisa Kimia

Doc. Name: SBMPTN2013BIO999 Doc. Version : 2013-10 | 01. Contoh keberadaan satwa pada suatu habitat yang dijaga dengan baik sebagai upaya pelestarian ex situ adalah… (A) Orang utan di hutan Kalimantan. (B) Cendrawasih di hutan Papua. (C) Rusa di Kebun Raya Bogor. (D) Pesut diSungai Mahakam. (E) Anoa di Pulau Sulawesi 02. Komunitas mikroba yang melekat pada suatu substrat/benda sehingga dapat merusak substrat/benda tersebut disebut… (A) Biodegradator. (B) Bioaktivator. (C) Biokatalis. (D) Biodeposit. (E) Biofilm. 03. Bagian sistem pencernaan yang berperan dalam memecah polipeptida menjadi oligopeptida adalah… (A) Duodenum. (B) Usus besar. (C) Lambung. (D) Jejunum. (E) Ileum. 04. Asam absisat melindungi tanaman yang mengalami kekurangan air melalui mekanisme… (A) Peningkatan pembentukan kutikula. (B) Penurunan tekanan turgor sel penjaga. (C) Peningkatan kecepatan pembelahan sel. (D) Penurunan kecepatan pembentangan sel. (E) Penghambatan pemanjangan sel epidermis. halaman 1 05. Pernyataan yang salah mengenai fotofosforilisasi siklik dan non siklik adalah… (A) Pada fotofosforilisasi non siklik sumber elektron yang memasuki Fotosistem II adalah molekul air, pada fotofosforilisasi siklik, sumber dari elektron adalah Fotosistem I. (B) Pada fotofosforilisasi non siklik penerima elktron terakhir adalah NADP, pada fotofosforilisasi siklik, penerima elektron terakhir adalah Fotosistem I. (C) Hasil dari fotofosforilisasi non siklik adalah ATP, NADPH, dan O2, sedangkan hasil dari fotofosforilisasi siklikhanya ATP. (D) Fotofosforilisasi non siklik melibatkan Fotosistem I dan II, fotofosforilisasi siklik hanya melibatkan Fotosistem II. 06. Perhatikan diagram saluran kreb berikut! Tahap dimana berlangsung hidrasi adalah (A) 1 dan 4 (B) 1 dan 5 (C) 2 dan 6 (D) 3 dan 7 (E) 3 dan 8 Kunci dan pembahasan soal ini bisa dilihat di www.zenius.net dengan memasukkan kode 3117 ke menu search. Copyright © 2013 Zenius Education SBMPTN 2013 Biologi, Kode Soal doc. name: SBMPTN2013BIO999 halaman 2 doc. version : 2013-10 | 07. Perhatikan gambar tahapan mitosis berikut! 10. Grafik berikut menunjukan kinerja insulin sintetis. Tahap telofase, metaphase, anaphase dan profasen ditunjukan oleh urutan angka…

SNMPTN 2012 - Siap Belajar
by top markotop 0 Comments favorite 4 Viewed Download 0 Times

SELEKSI NASIONAL MASUK PERGURUAN TINGGI NEGERI Disertai TRIK SUPERKILAT dan LOGIKA PRAKTIS Fisika IPA Disusun Oleh : Pak Anang Kumpulan SMART SOLUTION dan TRIK SUPERKILAT Pembahasan Soal SNMPTN 2012 Fisika IPA Kode Soal 634 By Pak Anang (http://pak-anang.blogspot.com) 16. Gerak sebuah benda dijelaskan oleh grafik hubungan antara kecepatan dan waktu seperti ditunjukkan gambar di bawah ini. TRIK SUPERKILAT: Jarak adalah luas daerah pada grafik 𝑣 − 𝑡: 𝑣(m/s) 4 −5 8 𝑡(s) −10 𝑠 = Luas segiempat + Luas trapesium 1 = (𝑝 × ℓ) + 𝑡(𝑎 + 𝑏) 2 1 = (5 × 4) + 4(5 + 10) 2 = 20 + 30 = 50 m Jarak yang ditempuh oleh benda hingga detik ke-8 adalah .... A. 60 m B. 50 m C. 45 m D. 40 m E. 30 m Penyelesaian: Ingat! Pada gerak GLB, jarak dirumuskan dengan: 𝑠 = 𝑣𝑡 Pada gerak GLBB, jarak dirumuskan dengan: 𝑠 = 𝑣0 𝑡 + 1 2 𝑎𝑡 2 Dari grafik kita bisa melihat bahwa benda bergerak mundur secara GLB pada detik ke-0 hingga detik ke-4. Sehingga, jarak yang ditempuh benda saat bergerak GLB adalah: 𝑠1 = 𝑣𝑡 = (−5) × 4 = −20 m Lalu benda kembali bergerak mundur secara GLBB pada detik ke-4 hingga detik ke-8, benda mengalami perlambatan sebesar: ∆𝑣 −10 − (−5) −5 = = = −1,25 ms −2 ∆𝑡 8−4 4 Sehingga jarak yang ditempuh benda saat bergerak GLBB adalah: 𝑎= 𝑠2 = 𝑣0 𝑡 + 1 2 1 𝑎𝑡 = ((−5) × 4) + ( × (−1,25) × (4)2 ) = (−20) + (−10) = −30 m 2 2 Jadi total jarak yang ditempuh benda adalah: 𝑠 = 𝑠1 + 𝑠2 = (−20) + (−30) = −50 m (tanda negatif menyatakan benda bergerak mundur) Bimbel SBMPTN 2013 Fisika by Pak Anang (http://pak-anang.blogspot.com) Halaman 1 17. Kedua ujung sebuah pegas yang memiliki tetapan pegas 50 N/m ditarik masing-masing dengan gaya sebesar 10 N yang saling berlawanan. Pertambahan panjang pegas tersebut adalah .... A. 0,0 m TRIK SUPERKILAT: B. 0,1 m Meskipun pegas menerima dua gaya yang sama besar dan C. 0,2 m berlawanan arah, bukan berarti pegas akan tambah panjang dua kali lipat. Karena kedua gaya tersebut adalah gaya aksi reaksi. D. 0,3 m Sehingga total pertambahan panjang pegas adalah 2𝑥. E. 0,4 m 𝐹 10 𝑥= Penyelesaian: 𝑘 = 50 = 0,2 m Ingat! Pada pegas berlaku: 𝐹 = 𝑘𝑥 Pada soal diketahui: 𝑘 = 50 N/m 𝐹1 = 10 𝑁 𝐹2 = −10 𝑁 (tanda negatif karena arah berlawanan dengan 𝐹1 ) Sehingga pertambahan panjang oleh sebuah gaya 𝐹 = 10 N pada pegas adalah: 𝐹 = 𝑘𝑥 ⇒ 𝑥 = 𝐹 10 = = 0,2 m 𝑘 50 𝑭𝟐 𝑭𝟏 𝑭𝟏 𝑭𝟐 𝒙 Jadi, meskipun ada dua gaya yang sama besar dan berlawanan pada pegas, namun dalam hal ini kedua gaya adalah pasangan gaya aksi-reaksi, sehingga gaya yang beriteraksi pada pegas sebenarnya hanyalah gaya sebesar 10 N saja. Jadi pertambahan panjang pegas adalah:...

« previous  123456789