SEARCH

Found 3193 related files. Current in page 1

double din install 2003 passat

Best Liquid Crystal Privacy Glass - Varioglass Canada

Liquid Crystal Glass: Vario Privacy smart glass is easily installed and can be used in many applications. Various configurations can be supplied including colour tinted, fire rated, double glazed, curved and shaped.

Coflexip® - Flexible Steel Pipe for Drilling and Service ... - Technip

DESCRIPTION OF A COFLEXIP® FLEXIBLE LINE The Coflexip® Flexible Line Coflexip® products are designed for oilfield services, both on and offshore, where heavy duty is required in combination with Flexible lines are manufactured in long continuous sections (up to several kilometres) and are cut to fit each client's requirements. End fittings with the most common types of end connectors are kept in stock thus minimising delivery times. End connectors not kept in stock will be machined or obtained according to the client's specifications. Delivery time depends mainly on the type of end connectors required and our client’s particular specifications. The pipe structure Coflexip® pipes are composed of successive layers of steel and thermoplastic to produce unique structures that have the strength and durability of steel pipes combined with the flexibility of reinforced rubber hoses. Each layer works independently from the others, as no vulcanisation is used during manufacturing. This results in the structural stability of the pipe. flexibility and Functions of Coflexip® pipe components reliability. These requirements are in applications such as: Choke and kill lines Rotary and vibrator lines Test lines Hydraulic lines Acid and cement lines Nitrogen lines Coflexip® flexible pipes for drilling and service applications are manufactured by the Drilling & Refining Applications Division of the Technip Group 2 1. The thermoplastic inner tube makes the pipe leak-tight. 2. The interlocked zeta and flat steel spiral pressure carcass resist internal pressure and external crushing loads. 3. The intermediate thermoplastic sheath is an anti-friction layer. 4. The double crosswound steel armours resist axial loads, protect the pipe from torsional strain resulting from handling and working conditions. 5. The thermoplastic outer jacket protects the armours from external corrosion. 6. The Stainless Steel Outer Wrap (SSOW), protects the pipe from mechanical impact, abrasion, weathering and accidental mishandling.

FLEXIBLE HOSE DATA SHEET_1 - EasyFlex

FLEXIBLE HOSE DATA SHEET EASYFLEX Flexible Sprinkler Drops are designed to significantly reduce labor and installation costs. By eliminating the need for pipe cutting and midline connections, you save valuable time and money. EASYFLEX Flexible Sprinkler Drops can be installed on almost any suspended commercial ceilings. The flexible hose allows for fast installation while our innovative brackets are simple and easy to install. Brackets for T-Bar ceiling grids, wall mount, metal studs, woodbeams, open hat channels, industrial ducts, and cleanrooms. No special tools required, and installation completed in a few easy steps. Flexible hoses come in braided or unbraided types, from 24” to 72” in length. EASYFLEX Flexible Sprinkler Drops Appliance Standards National Fire Protection Association (NFPA): - NFPA 13: Standard for the Installation of Sprinkler Systems - NFPA 13D: Standard for the Installation of Sprinkler Systems in One and Two-Family Dwellings and Manufactured Homes - NFPA 13R: Standard for Installation of Sprinkler Systems in residential Occupancies up to and including four stories in height American Society for Testing and Methods (ASTM): - ASTM C635: Standards specifications for the manufacture, performance, and testing of metal suspension systems for acoustical tile and lay-in panel ceilings...

Suzuki Hayabusa 2000 - 2005
by nkono 0 Comments favorite 3 Viewed Download 0 Times

Suzuki Hayabusa 2000 - 2005 Engine Protection Cage installation instructions Items included in this kit Cage loop (1each) Side struts (2 each) Extended frame sliders (2 each) Hardware kit (1 each) (contents listed below) M10-1.25 x 70mm bolt (1 each) M10-1.25 x 80mm bolt (1 each) ¼”-20 x 1 ½” bolts (2 each) ¼”-20 x 2” bolts (2 each) ¼”-20 lock nuts (4 each) 3/8”-24 x ¾” bolts (2 each) Flange Bushings (2 each) M10-1.5 x 15 1/2" all thread rod (1 each) M10-1.5 hex nuts (2 each) 1. Follow installation instructions for extended frame sliders. (See page 1) Note: Do not attach delron tips or tighten extended frame sliders until all components are installed. 2. Place the cage loop inside short telescoping tubes on sliders (See fig. G), push the ¼”-20 x 1 ½” bolts through the bolt holes in the telescoping tubes from the outside and start the ¼”-20 lock nuts. Do not tighten lock nuts at this time. 3. Install the left side strut using the all thread rod, flange bushings and hex nuts provided. Slide the following components over one end of the all thread rod in this order: flange bushing marked with "L", side strut marked with "L" and one M10-1.5 hex nut. (See fig A) Slide the all thread rod through the swing arm bolt on the left side of the motorcycle. (make sure the flange bushing slides into the swing arm bolt) On the right side of the motorcycle slide the following components over the all thread rod in this order: flange bushing marked "R", side strut marked "R" and M10-1.5 hex nut. (you may need to hold the left side to ensure it stays in place) 4. Push the bottom of the cage loop towards the rear of the motorcycle while pulling the bottom of the left side strut towards the front until the bolt hole on the side strut meets the threaded hole on the tab welded to the cage loop. Attach the side strut to the outside of the tab on the cage loop with a 3/8”-24 x ¾” bolt. (See fig J) Do not tighten the bolt at this time. Repeat for other side. 5. Once all components are attached tighten all bolts and nuts. Be sure to torque all engine mount bolts to factory specifications. Torque the hex nuts on the all thread stud to 12ft lbs. We recommend using "blue" loctite on the all thread stud to ensure the hex nuts do not vibrate loose. 6. Install delron tips with ¼”-20 x 2” bolts and ¼”-20 lock nuts.

Full System Instructions - Two Brothers Racing

Installation Instructions 1. Make sure the bike is completely cool before starting the installation. Make sure the bike is secure on a centerstand or ideally a service lift. 2. Remove rear lower cowling. 3. Remove OEM mufflers. V.A.L.E. TM 2008 Suzuki V a r i a b l e A x i s L o c k i n g E x h a u s t HAYABUSA V.A.L.E.™ Complete Exhaust System with M-2 Canister Part # 005-1930106V / 005-1930107V / 005-1930108V 8. 9. 4. The horn should also be removed for more radiator clearance. Install the TBR head pipes. (Each piece is labeled for proper postioning). From Left to Right, install head pipes 1, 2, 3, and then 4. Use the OEM gasket between the head pipes and cylinder head. Remove cowling from both the left and right sides. “M” Parts List Qty. Description 1 15” Muffler Canister 1 4-2-1 Slip-on Tube 1 4-2-1 Header Assembly 1 HARDWARE KIT 1 8x55mm Socket Head Flat Bolt (Black) 6 80mm Springs 1 8x16mm Flange Bolt 4 6x14mm Socket Head Cap Screw 1 Barrel Clamp 1 5mm Long Handle Ball End Hex Wrench 4 6mm Split Lock Washer 2 TBR Script Logo Yellow Decal 4” “1” Muffler Slip-tube Part Number Varies 005-19301S 005-19301HK 005-193-3C 005-SHF855B 005-S-80 005-FB816 005-SH814 005-27-66MSH 005-9-18610 005-WL6 015-10208-A 5. “2” “3” “R” “4” Remove radiator braces. 6. “L ” Remove O2 sensore from OEM head pipe. 10. Install the collectors to the bottom of the head pipes. The collectors are labeled “L for left and “R” for Right. ” IMPORTANT - PLEASE READ CAREFULLY We recommend that this performance part be installed by a qualified motorcycle technician. If you have any doubts as to your ability to install this performance part, please consult with your local motorcycle dealer. Read all instructions first before starting installation. Make sure the motorcycle and exhaust system are completely cool before starting the installation. Also, make sure the bike is secure on a centerstand or ideally a service lift during installation. Be sure to save all stock components for possible use later.

RCC Turbos - Stage 1 Turbo Install - Suzuki Hayabusa - Gen 1

RCC Turbos - Stage 1 Turbo Install: Suzuki Hayabusa (Gen 1) • Preparation/Disassembly: Remove the seat. Disconnect negative terminal on the battery. Drain the fuel tank. Remove the fuel tank. Remove the stock fuel pump from the tank. Remove the air box. Remove the MAP sensor and temperature sensor from the air box. Remove left and right side fairings. Drain engine oil. Drain engine coolant. Remove the oil filter Remove the oil restrictor, behind the filter. Remove the oil cooler lines. Remove the radiator and oil cooler, as one unit, leaving only the bracket/support for radiator (before reinstalling the radiator please remove all the tabs along the bottom of the radiator). Remove the entire exhaust system. Remove the PAIR system. Remove the oil pan from the engine. • Sensor Bracket Modification: On the left hand side of bike, on the inside of the frame, you will see a bracket, with a plastic vacuum canister, vacuum control solenoid valve, atmospheric pressure sensor, and some vacuum lines, with a check valve in the vacuum line. Please remove this entire bracket, eliminate all the vacuum lines, the plastic canister, and the control solenoid valve, and also cut off the metal tab that held the vacuum canister. Then reinstall this bracket with only the atmospheric pressure sensor, and plug the wires back in. • Tap/plug PAIR System Holes: Tap the four small PAIR system holes, above the exhaust ports, with an M6 x 1.0 tap. Install the four small M6 screws into the exhaust holes after tapping them. • Modify the Oil Pan: Drill a ¾” hole on the left side of the oil pan. Use thread sealant on the washer, and red Loctite on the threads. Make sure the sealing washer is against the inside of pan, then the stainless flat washer, then the nut. Once the fitting is installed, reinstall the oil pan. • Install Header/Turbo/Oil Lines/Exhaust: Install the header and turbo as a unit, but with the bolts loose. Use four of your original header bolts on the top of the turbo header (Allen head). Use the four new bolts on the bottom row of the header (M8, 10mm flange head). PLEASE NOTE! After installing the dump pipes and waste gate, the nipple on the top of the waste gate remains open, and no hose gets installed on the top fitting. The top fitting is used for boost control on Stage 2 and higher end kits. It is not used on Stage 1 kits.

Resume Samples - Boston University
by Deppony 0 Comments favorite 1 Viewed Download 0 Times

Boston University College of Communication Career Services Résumé Samples 640 Commonwealth Avenue • Boston, MA 02215 • 617/353-3490 • comjobs@bu.edu www.bu.edu/com-csc E-mailable Fonts: Times, Times New Roman Font Size: Type name in 20 – 24 and all other text should be 10, 11, or 12 point depending on the amount of text Margin Settings: Go to Format, select Document, and set Top and Bottom at 0.5 or 0.6, Left and Right should be 0.7 or 0.8 To set a line below name and address, go to left align, then select Auto Shapes and select lines, clicking on the straight line. Insert line under name and address. Once line is in place you may enhance the line by selecting “More Lines” to the far right of Auto Shapes. To delect settings for your format., drag left indent/hanging indent/first line indent to 1 1/4 inches. Drag first line indent back to 0. Set two left tabs, 1/4 inch apart, to the right of left indent/hanging in dent. Change tab by clicking twice to right tab. Insert one right tab at 6 3/4 inches. Bullets are made by selecting “option*. SAMPLE RESUME #1 – Basic Format Your Name Street Address • City, State, Zip • Telephone number • E-mail (Centered) List two Addresses if you need both Present and Permanent Address ( Centered) OBJECTIVE Seeking a full-time position in Advertising/Marketing – or Seeking an internship in Television Production EDUCATION Boston University College of Communication Boston, MA Bachelor of Science in (Communication, Journalism, or Film and Television) Expected May 2003 Concentration in (Advertising or Public Relations, or Film Production, etc.) Dean’s List Liberal Arts Concentration (or Minor if you have one) in English Current GPA: 3.6/4.0 London Internship Programme (or other study abroad) Studies in …………….. London, England September – December 2002 Related Course Work (Add left tabs at 4 1/4 and 4 1/2) • Course Name • Course Name • Course Name • Course Name RELATED EXPERIENCE Name of Company Title • Information about what you did and accomplished • Start each phrase with action words • If job is current use present tense - If job is over use past tense Name of Company (Don’t forget academic experience such as AdLab) Title • What you did for company or client • More information about what you did Prior Title (if you have held two different positions at the same company) City, State Dates

The Puppy World
by thepuppyworld 0 Comments favorite 4 Viewed Download 0 Times

We are family of 3 breeder located in Spartanburg SC, Sanford NC, Concord NC - just North-East of Greenville SC, Raleigh NC, Charlotte NC. We have been raising Siberian Husky since 2003, AKK since 2008, and Dobermans since 2010. http://www.thepuppyworld.com

UC3020A / UC3520A / UC4020A Chain Saw - Makita

Satisfy Professional's Needs Chain Saw UC3020A / UC3520A / UC4020A 300mm (12") 350mm (14") 400mm (16") Designed with the concept of "Easy Operation and Maintenance" Rubberized Soft Rear Grip Toolless Blade Change and Adjustment Large View Window of Oil Tank Ergonomically Positioned and Angled Front Grip Flat External Design Metal Spike Bumper Provides increased stability in tool maintenance such as oiling/blade change. Powerful Cutting Thanks to the High Torque Delivered by Heavy-Duty 1,800 W Motor. Chain Saw UC3020A 300mm (12") / UC3520A 350mm (14") / UC4020A 400mm (16") 132 Double Insulation Electric Brake Automatic Oiling Chain Brake Specification Continuous rating Input Chain speed per minute Guide bar length Chain Blade Dimensions (L x W x H) Net weight Power supply cord Standard equipment UC3020A UC3520A UC4020A 1,800W 800m (2,620ft) 300mm (12") pitch : 3/8" gauge : 0.050" 417 x 245x 198mm (19-3/8" x 9-5/8" x 7-3/4" ) 3.7kg (8.2lbs) 0.3m (0.98ft) 1,800W 800m (2,620ft) 350mm (14") pitch : 3/8" gauge : 0.050" 417 x 245x 198mm (19-3/8" x 9-5/8" x 7-3/4" ) 3.7kg (8.2lbs) 0.3m (0.98ft) 1,800W 800m (2,620ft) 400mm (16") pitch : 3/8" gauge : 0.050" 417 x 245x 198mm (19-3/8" x 9-5/8" x 7-3/4" ) 3.7kg (8.2lbs) 0.3m (0.98ft) Chain Blade, Guide Bar Scabbard, Hook completed Dimensions and Net weight : excluding blade and guide bar Items of standard equipment and specifications may differ from country to country.

About Parque Central Hotel About The Greenwich Arts Council

Pricing Information The cultural scene in Cuba is rich and we will have many opportunities to experience this richness. We will exchange cultural ideas at the homes of artists (some of them internationally known) see their work, visit various craft fairs, experience the wonderful national art museum in Havana, as well as the museum of the Revolution and other historic sites and enjoy the Latin music and dance of Cuba. Our time in Havana will include walks through Old Havana, a UNESCO World Heritage Site and visits to other neighborhoods which display the incredibly diverse architectural and artistic glories of Cuba. Trip to Havana Includes: Flights Miami - Havana - Miami via US chartered flights ALL meals but three dinners in Paladars (private homes - approx. $50 pp, each), Airport Exit Tax: approx. 25 Cuban Convertible Pesos - to be paid in Cuban Convertible Pesos (approx. $30 dollars) and gratuities to the guide and driver. $5,800 per person based on double occupancy Single supplement: please add $700 About Parque Central Hotel Standing in the heart of Old Havana, facing Central Park and just a few minutes from the Capitol and several major tourist attractions. This historic site was considered the heart of Havana in the 1950s and 1960s as it served as a venue for well-known Cuban orchestras and musicians such as Aragon and Enrique Jorrín. Over time the original hotel structure deteriorated and in 1999 the reinvented Hotel Parque Central opened its doors. This elegant and magnificent space located in the historic center of Havana is a harmonious mixture of past and future.

« previous  123456789