SEARCH

Found 6372 related files. Current in page 1

dodge dakota rear brake line diagram

Survey Of Flexible Piping Systems - US Environmental Protection ...

March 1997 ICF Incorporated Fairfax, VA BACKGROUND For the purposes of this survey, a flexible pipeline is defined as a pipeline constructed of flexible material that can be installed in single long runs without the necessity of regular joints either to extend the length of the line or change directions. This material is usually shipped in rolls that are hundreds of feet long, with the installer cutting lengths to fit the requirements of each installation. Most varieties of flexible piping are available with secondary containment either as an option or an integral part of the primary piping. In all cases, the secondary containment piping will not serve as primary piping. The secondary containment piping is designed to channel leakage back to a sump or monitor point, where it can be detected. Because these pipelines differ significantly from the more traditional steel and fiberglass reinforced plastic (FRP) pipelines, the U.S. Environmental Protection Agency (EPA) has periodically requested a survey of their characteristics and availability. This is the third installment of this survey.1

Coflexip® - Flexible Steel Pipe for Drilling and Service ... - Technip

DESCRIPTION OF A COFLEXIP® FLEXIBLE LINE The Coflexip® Flexible Line Coflexip® products are designed for oilfield services, both on and offshore, where heavy duty is required in combination with Flexible lines are manufactured in long continuous sections (up to several kilometres) and are cut to fit each client's requirements. End fittings with the most common types of end connectors are kept in stock thus minimising delivery times. End connectors not kept in stock will be machined or obtained according to the client's specifications. Delivery time depends mainly on the type of end connectors required and our client’s particular specifications. The pipe structure Coflexip® pipes are composed of successive layers of steel and thermoplastic to produce unique structures that have the strength and durability of steel pipes combined with the flexibility of reinforced rubber hoses. Each layer works independently from the others, as no vulcanisation is used during manufacturing. This results in the structural stability of the pipe. flexibility and Functions of Coflexip® pipe components reliability. These requirements are in applications such as: Choke and kill lines Rotary and vibrator lines Test lines Hydraulic lines Acid and cement lines Nitrogen lines Coflexip® flexible pipes for drilling and service applications are manufactured by the Drilling & Refining Applications Division of the Technip Group 2 1. The thermoplastic inner tube makes the pipe leak-tight. 2. The interlocked zeta and flat steel spiral pressure carcass resist internal pressure and external crushing loads. 3. The intermediate thermoplastic sheath is an anti-friction layer. 4. The double crosswound steel armours resist axial loads, protect the pipe from torsional strain resulting from handling and working conditions. 5. The thermoplastic outer jacket protects the armours from external corrosion. 6. The Stainless Steel Outer Wrap (SSOW), protects the pipe from mechanical impact, abrasion, weathering and accidental mishandling.

Suzuki Hayabusa 2000 - 2005
by nkono 0 Comments favorite 3 Viewed Download 0 Times

Suzuki Hayabusa 2000 - 2005 Engine Protection Cage installation instructions Items included in this kit Cage loop (1each) Side struts (2 each) Extended frame sliders (2 each) Hardware kit (1 each) (contents listed below) M10-1.25 x 70mm bolt (1 each) M10-1.25 x 80mm bolt (1 each) ¼”-20 x 1 ½” bolts (2 each) ¼”-20 x 2” bolts (2 each) ¼”-20 lock nuts (4 each) 3/8”-24 x ¾” bolts (2 each) Flange Bushings (2 each) M10-1.5 x 15 1/2" all thread rod (1 each) M10-1.5 hex nuts (2 each) 1. Follow installation instructions for extended frame sliders. (See page 1) Note: Do not attach delron tips or tighten extended frame sliders until all components are installed. 2. Place the cage loop inside short telescoping tubes on sliders (See fig. G), push the ¼”-20 x 1 ½” bolts through the bolt holes in the telescoping tubes from the outside and start the ¼”-20 lock nuts. Do not tighten lock nuts at this time. 3. Install the left side strut using the all thread rod, flange bushings and hex nuts provided. Slide the following components over one end of the all thread rod in this order: flange bushing marked with "L", side strut marked with "L" and one M10-1.5 hex nut. (See fig A) Slide the all thread rod through the swing arm bolt on the left side of the motorcycle. (make sure the flange bushing slides into the swing arm bolt) On the right side of the motorcycle slide the following components over the all thread rod in this order: flange bushing marked "R", side strut marked "R" and M10-1.5 hex nut. (you may need to hold the left side to ensure it stays in place) 4. Push the bottom of the cage loop towards the rear of the motorcycle while pulling the bottom of the left side strut towards the front until the bolt hole on the side strut meets the threaded hole on the tab welded to the cage loop. Attach the side strut to the outside of the tab on the cage loop with a 3/8”-24 x ¾” bolt. (See fig J) Do not tighten the bolt at this time. Repeat for other side. 5. Once all components are attached tighten all bolts and nuts. Be sure to torque all engine mount bolts to factory specifications. Torque the hex nuts on the all thread stud to 12ft lbs. We recommend using "blue" loctite on the all thread stud to ensure the hex nuts do not vibrate loose. 6. Install delron tips with ¼”-20 x 2” bolts and ¼”-20 lock nuts.

Full System Instructions - Two Brothers Racing

Installation Instructions 1. Make sure the bike is completely cool before starting the installation. Make sure the bike is secure on a centerstand or ideally a service lift. 2. Remove rear lower cowling. 3. Remove OEM mufflers. V.A.L.E. TM 2008 Suzuki V a r i a b l e A x i s L o c k i n g E x h a u s t HAYABUSA V.A.L.E.™ Complete Exhaust System with M-2 Canister Part # 005-1930106V / 005-1930107V / 005-1930108V 8. 9. 4. The horn should also be removed for more radiator clearance. Install the TBR head pipes. (Each piece is labeled for proper postioning). From Left to Right, install head pipes 1, 2, 3, and then 4. Use the OEM gasket between the head pipes and cylinder head. Remove cowling from both the left and right sides. “M” Parts List Qty. Description 1 15” Muffler Canister 1 4-2-1 Slip-on Tube 1 4-2-1 Header Assembly 1 HARDWARE KIT 1 8x55mm Socket Head Flat Bolt (Black) 6 80mm Springs 1 8x16mm Flange Bolt 4 6x14mm Socket Head Cap Screw 1 Barrel Clamp 1 5mm Long Handle Ball End Hex Wrench 4 6mm Split Lock Washer 2 TBR Script Logo Yellow Decal 4” “1” Muffler Slip-tube Part Number Varies 005-19301S 005-19301HK 005-193-3C 005-SHF855B 005-S-80 005-FB816 005-SH814 005-27-66MSH 005-9-18610 005-WL6 015-10208-A 5. “2” “3” “R” “4” Remove radiator braces. 6. “L ” Remove O2 sensore from OEM head pipe. 10. Install the collectors to the bottom of the head pipes. The collectors are labeled “L for left and “R” for Right. ” IMPORTANT - PLEASE READ CAREFULLY We recommend that this performance part be installed by a qualified motorcycle technician. If you have any doubts as to your ability to install this performance part, please consult with your local motorcycle dealer. Read all instructions first before starting installation. Make sure the motorcycle and exhaust system are completely cool before starting the installation. Also, make sure the bike is secure on a centerstand or ideally a service lift during installation. Be sure to save all stock components for possible use later.

RCC Turbos - Stage 1 Turbo Install - Suzuki Hayabusa - Gen 1

RCC Turbos - Stage 1 Turbo Install: Suzuki Hayabusa (Gen 1) • Preparation/Disassembly: Remove the seat. Disconnect negative terminal on the battery. Drain the fuel tank. Remove the fuel tank. Remove the stock fuel pump from the tank. Remove the air box. Remove the MAP sensor and temperature sensor from the air box. Remove left and right side fairings. Drain engine oil. Drain engine coolant. Remove the oil filter Remove the oil restrictor, behind the filter. Remove the oil cooler lines. Remove the radiator and oil cooler, as one unit, leaving only the bracket/support for radiator (before reinstalling the radiator please remove all the tabs along the bottom of the radiator). Remove the entire exhaust system. Remove the PAIR system. Remove the oil pan from the engine. • Sensor Bracket Modification: On the left hand side of bike, on the inside of the frame, you will see a bracket, with a plastic vacuum canister, vacuum control solenoid valve, atmospheric pressure sensor, and some vacuum lines, with a check valve in the vacuum line. Please remove this entire bracket, eliminate all the vacuum lines, the plastic canister, and the control solenoid valve, and also cut off the metal tab that held the vacuum canister. Then reinstall this bracket with only the atmospheric pressure sensor, and plug the wires back in. • Tap/plug PAIR System Holes: Tap the four small PAIR system holes, above the exhaust ports, with an M6 x 1.0 tap. Install the four small M6 screws into the exhaust holes after tapping them. • Modify the Oil Pan: Drill a ¾” hole on the left side of the oil pan. Use thread sealant on the washer, and red Loctite on the threads. Make sure the sealing washer is against the inside of pan, then the stainless flat washer, then the nut. Once the fitting is installed, reinstall the oil pan. • Install Header/Turbo/Oil Lines/Exhaust: Install the header and turbo as a unit, but with the bolts loose. Use four of your original header bolts on the top of the turbo header (Allen head). Use the four new bolts on the bottom row of the header (M8, 10mm flange head). PLEASE NOTE! After installing the dump pipes and waste gate, the nipple on the top of the waste gate remains open, and no hose gets installed on the top fitting. The top fitting is used for boost control on Stage 2 and higher end kits. It is not used on Stage 1 kits.

YOUR NAME - Boston College
by Deppony 0 Comments favorite 5 Viewed Download 0 Times

YOUR NAME yourname@bc.edu (no hyperlink/line), 617-656-0000 Your Boston College address here, Chestnut Hill, MA 02467 Your home address here, Any Town, CA 01000 EDUCATION Boston College Chestnut Hill, MA College of Arts and Sciences (optional full, formal name of school you are in) Bachelor of Arts /Science in Major Minor (if you have one) anticipated May 200x GPA 3.xx (incl. GPA if > 3.00, do NOT round up) Honors/Awards: Dean’s List, Golden Key, AHANA Honor Roll Relevant courses (optional) (if applicable - no more than 4-5 upper level classes ) Abroad University, City, Country Studied (courses/subjects included) Spring Semester, 200x EXPERIENCE Name of Organization City, State Start date - end date Job title • Describe any accomplishments that you achieved at your job • Explain what you did, how you did it, why you did it, and what the results were • Whenever possible, quantify the number of people/items/data that you worked with ( Use present tense for verbs describing jobs that you are currently performing) Name of Organization City, State Start date - end date Job title • Describing Accomplishments: Result + Action + Problem/Project = good bullet point • Sample vague bullet point: Assisted with general upkeep and organization of homeless shelter • Sample good bullet points: Prepared and served meals to 50 homeless male residents; Maintained organization of supply closet and distributed resources to residents as needed; Acted as a liaison between program participants and staff members. VOLUNTEER EXPERIENCE and/or ACTIVITIES Name of first Organization City, State Start date - end date Title • Focus on a few key skills that your industry is looking for, and demonstrate how you used those skills through the description of the tasks/projects you accomplished at your job. Name of second Organization (brief description if necessary) City, State Start Date - end date Title • Remember to be consistent; punctuation at the end of the phrases is not necessary unless you are using paragraph formatting ACTIVITIES Section: List each organization (add an action verb phrase describing an acquired skill if you have space) SKILLS Computers: Microsoft Excel, PowerPoint, Word, and any other relevant computer skills or languages Language: List all languages you are fluent or proficient in or currently studying, if listed as fluent, should be able to conduct interview in that language. The resume samples included in this packet should be used as a starting point for visual models and general guidelines. Be sure to view all of the samples below for various styles/formats and resume tips. Please note that a small number of examples are show below. Each student is encouraged to construct a resume that fits his/her need.

Resume Samples - Boston University
by Deppony 0 Comments favorite 1 Viewed Download 0 Times

Boston University College of Communication Career Services Résumé Samples 640 Commonwealth Avenue • Boston, MA 02215 • 617/353-3490 • comjobs@bu.edu www.bu.edu/com-csc E-mailable Fonts: Times, Times New Roman Font Size: Type name in 20 – 24 and all other text should be 10, 11, or 12 point depending on the amount of text Margin Settings: Go to Format, select Document, and set Top and Bottom at 0.5 or 0.6, Left and Right should be 0.7 or 0.8 To set a line below name and address, go to left align, then select Auto Shapes and select lines, clicking on the straight line. Insert line under name and address. Once line is in place you may enhance the line by selecting “More Lines” to the far right of Auto Shapes. To delect settings for your format., drag left indent/hanging indent/first line indent to 1 1/4 inches. Drag first line indent back to 0. Set two left tabs, 1/4 inch apart, to the right of left indent/hanging in dent. Change tab by clicking twice to right tab. Insert one right tab at 6 3/4 inches. Bullets are made by selecting “option*. SAMPLE RESUME #1 – Basic Format Your Name Street Address • City, State, Zip • Telephone number • E-mail (Centered) List two Addresses if you need both Present and Permanent Address ( Centered) OBJECTIVE Seeking a full-time position in Advertising/Marketing – or Seeking an internship in Television Production EDUCATION Boston University College of Communication Boston, MA Bachelor of Science in (Communication, Journalism, or Film and Television) Expected May 2003 Concentration in (Advertising or Public Relations, or Film Production, etc.) Dean’s List Liberal Arts Concentration (or Minor if you have one) in English Current GPA: 3.6/4.0 London Internship Programme (or other study abroad) Studies in …………….. London, England September – December 2002 Related Course Work (Add left tabs at 4 1/4 and 4 1/2) • Course Name • Course Name • Course Name • Course Name RELATED EXPERIENCE Name of Company Title • Information about what you did and accomplished • Start each phrase with action words • If job is current use present tense - If job is over use past tense Name of Company (Don’t forget academic experience such as AdLab) Title • What you did for company or client • More information about what you did Prior Title (if you have held two different positions at the same company) City, State Dates

Sevier County Map [PDF] - Tennessee Department of Transportation

7I. 441. 9. 70. 25. W. 139. 139. 40. 66. 71. 35. 441. 70. 9. 25. W. 338. 66. 338. 338 . 71. 441. 35. 35. 441. 321. 321. 73. 35. 35. 339. 339. 321. 73. 321. 73. 40. 416. E T GS R N SO R D . N W. A. BROWN RD. DR. 83 LL T UT W O M N . . RD Cr. Br . Cr. . D T N F A O D D . C R T O R es RD ec B re Br. h A G BO CA HO M LL P OW . RD R R A P O W EL L OW . RD SS LL HO RU Cr. Br. d loo gb un Yo S W 2 LL A 3 LL B R N D . O . O H . R T D A . T E H W Y E. O ky ac Ch S O Dam T H l M il A H A R H . M PRIMITIVE OR UNIMPROVED ROAD . Cr Redwine ag Sn Cr. r. r. O.5 DISTANCE IN MILES BETWEEN DESIGNATED HIGHWAY INTERCHANGE . 235NW Br. COUNTY LINE R STATE LINE y Du le d B ir Porters n C r. A on g Br. Ho Pro rses le ou B r. ng d va r I ts er IN A St yx Le st Sh ut Br. L GENERAL HIGHWAY MAP W S Br. hoe Lo Prong w es Pr on g N C e JA K C E R .T S R . r. O C Cave nd co Se TUNNEL s

Cheap a line wedding dresses uk online shop with free shipping from dressmebridal.co.uk

Looking for the perfect cheap a line wedding dresses uk online. Shopping our extensive collection of a line wedding dresses with free shipping by dressmebridal.co.uk at affordable wholesale price.

The Ministry of Defence - Makita UK
by januar 0 Comments favorite 2 Viewed Download 0 Times

The Ministry of Defence Makita and the MoD For almost five years Makita have been the sole supplier of powertools to the Ministry of Defence The Royal Engineers regiment recently took delivery of a further 500 Makita DCS5030 chainsaws, spares and specially designed rucksacks for carrying the lightweight chainsaws in rugged terrain. The British military uses chainsaws to clear wooded areas to set up forward operating bases, helicopter landing zones and for ground clearance to provide a clear line of sight for security and safety in hostile locations. The Royal Engineers are responsible for a broad range of facility logistics and with military operations of all descriptions, the Corps are regularly required to quickly establish new operation locations, sometimes in rural territory. It maybe necessary to fell trees quickly and safely to allow vehicle or helicopter access and the Makita DCS5030 50cc 3.8hp chainsaw is ideal for this type of use. It weighs Makita chainsaws and disc cutters are also on the front line with the British Navy. The Royal Navy is also equipped with Makita chainsaws, mainly for use in their valuable roll in disaster relief as a naval ship is often the first available outside assistance for a location hit by tornados, flooding, earthquake or tsunami.

« previous  123456789