SEARCH

Found 3404 related files. Current in page 10

contoh-surat-sebutharga-servis-repair-aircond

Diagnostic Procedures Manual - Delco Remy

1-4. The primary emphasis of this manual is to define the procedures to determine “what caused the symptoms.” Actual adjustment, repair or replacement procedures are provided in unit specific service bulletins and manuals. 1-5. For educational purposes, study of this entire manual is recommended. For diagnostic purposes, the flow charts in Section II will reference appropriate procedures for specific symptoms. 1-6. EQUIPMENT REQUIRED. To perform the tests specified in this manual, the following equipment is required: 1. A variable carbon pile load tester, more than 500 amps capacity with ammeter (and voltmeter). 2. A separate DC voltmeter, digital preferred, capable of reading 0.01 volt increments. 3. An inductive (clamp-on) ammeter for safe and accurate current measurements. The purpose of this manual is to provide diagnostic procedures that can be used for troubleshooting a heavy-duty electrical system, consisting of the starting system and the charging system. Some of the procedures described in this manual may also be used for preventative maintenance checks. These procedures are applicable to systems using Heavy Duty Starters such as: Delco Remy 37 MT, 41 MT, 42 MT, 50 MT or similar with adequate battery power for the engine/starter application used. 1-3. DEFINITION OF “DIAGNOSIS.” Diagnosis is the three part process that begins when a problem is perceived and ends when the equipment is confirmed as serviceable. The process can be described by using three questions that must be answered to assure completion: 1. What are the symptoms? This is what has been observed (seen, heard, felt or smelled) that indicates a problem. 2. What caused the symptoms? This involves using diagnostic procedures to identify the root cause of the problem. 3. How do we fix it? Usually this involves the adjustment, repair or replacement of some part or parts.

BASIC CHARGING SYSTEM TROUBLE SHOOTING CHART NOTE ...

GENERAL INFORMATION Trouble Shooting - Basic Procedures GENERAL INFORMATION Trouble Shooting - Basic Procedures * PLEASE READ THIS FIRST * NOTE: This is GENERAL information. This article is not intended to be specific to any unique situation or individual vehicle configuration. The purpose of this Trouble Shooting information is to provide a list of common causes to problem symptoms. For model-specific Trouble Shooting, refer to SUBJECT, DIAGNOSTIC, or TESTING articles available in the section(s) you are accessing. ACCESSORIES & ELECTRICAL CHARGING SYSTEM TROUBLE SHOOTING NOTE: This is GENERAL information. This article is not intended to be specific to any unique situation or individual vehicle configuration. The purpose of this Trouble Shooting information is to provide a list of common causes to problem symptoms. For model-specific Trouble Shooting, refer to SUBJECT, DIAGNOSTIC, or TESTING articles available in the section(s) you are accessing. NOTE: This is GENERAL information. This article is not intended to be specific to any unique situation or individual vehicle configuration. The purpose of this Trouble Shooting information is to provide a list of common causes to problem symptoms. For model-specific Trouble Shooting, refer to SUBJECT, DIAGNOSTIC, or TESTING articles available in the section(s) you are accessing. BASIC CHARGING SYSTEM TROUBLE SHOOTING CHART CONDITION & POSSIBLE CAUSE CORRECTION Vehicle Will Not Start me Saturday, April 18, 2009 3:35:56 AM 3:36:11 Page 1 © 2005 Mitchell Repair Information Company, LLC. 2007 Chrysler Sebring GENERAL INFORMATION Trouble Shooting - Basic Procedures Dead battery Check battery cells, alternator belt tension and alternator output Check all charging system connections Check and replace as necessary Loose or corroded battery connections Ignition circuit or switch malfunction Alternator Light Stays On With Engine Running Loose or worn alternator drive belt Loose alternator wiring connections Short in alternator light wiring Defective alternator stator or diodes Defective regulator Alternator Light Stays Off With Ignition Switch ON Blown fuse Defective alternator Defective indicator light bulb or socket Check alternator drive tension and condition, See Belt Adjustment in TUNE-UP article in the TUNE-UP section Check all charging system connections See Indicator Warning Lights in STANDARD INSTRUMENTS in the ACCESSORIES & EQUIPMENT section See Bench Tests in ALTERNATOR article See Regulator Check in ALTERNATOR article See WIRING DIAGRAMS See Testing in ALTERNATOR article See Indicator Warning Lights in STANDARD INSTRUMENTS in the ACCESSORIES & EQUIPMENT section me Saturday, April 18, 2009 3:35:57 AM

SURAT PERNYATAAN PENYEDIA BARANG DAN JASA DALAM ...

Dengan ini menyatakan bersedia untuk mengikuti kegiatan pengadaan barang dan jasa secara elektronik (eProcurement) di BPJS KETENAGAKERJAAN dan tunduk pada persyaratan‐persyaratan yang berlaku sebagai berikut. 1. Telah melakukan registrasi Penyedia Barang dan Jasa di BPJS KETENAGAKERJAAN secara online; 2. Setuju untuk menegakkan Pakta Integritas Penyedia Barang dan Jasa di BPJS KETENAGAKERJAAN: a. Tidak akan melakukan praktek Korupsi, Kolusi dan Nepotisme (KKN) dengan oknum karyawan BPJS KETENAGAKERJAAN atau sesama Penyedia Barang dan Jasa dalam proses pengadaan barang dan jasa di lingkungan BPJS KETENAGAKERJAAN; b. Sanggup memenuhi segala persyaratan yang tercantum pada dokumen pengadaan dan tunduk pada peraturan‐peraturan di lingkungan BPJS KETENAGAKERJAAN serta peraturan perundang‐undangan yang berlaku; c. Dalam proses pengadaan barang dan jasa di lingkungan BPJS KETENAGAKERJAAN, berjanji akan menyampaikan informasi yang benar dan eProcurement BPJS Ketenagakerjaan Halaman 1 dapat dipertanggung jawabkan serta melaksanakan tugas secara bersih, transparan, dan profesional dalam arti akan mengerahkan segala kemampuan dan sumber daya secara optimal untuk memberikan hasil kerja terbaik mulai dari penyiapan penawaran, pelaksanaan, dan penyelesaian pekerjaan/pengiriman barang; d....

pedoman umum perencanaan pengadaan barang/jasa pemerintah ...

PEDOMAN UMUM PERENCANAAN PENGADAAN BARANG/JASA PEMERINTAH DI LINGKUNGAN KEMENTERIAN/LEMBAGA/SATUAN KERJA PERANGKAT DAERAH/INSTITUSI LAINNYA DAFTAR ISI BAB I KETENTUAN UMUM 1 1.1 Pendahuluan 1 1.2 Pengertian Istilah 1 1.3 Dasar Hukum 3 1.4 Maksud dan Tujuan 4 1.4.1 Maksud 4 1.4.2 Tujuan 4 1.5 Ruang Lingkup 1.5.1 4 Prosedur Penyusunan Rencana Umum Pengadaan Barang/Jasa 1.5.2 BAB II 4 Persiapan Pelaksanaan Pengadaan Barang/Jasa 5 PROSEDUR PENYUSUNAN RENCANA UMUM PENGADAAN BARANG/JASA 6 2.1 Penyusunan RKA-K/L/D/I 6 2.2 Penyusunan Rencana Umum Pengadaan dan hubungannya dengan Penyusunan Rencana Kerja dan Anggaran K/L/D/I 2.2.1 Penyusunan Rencana hubungannya dengan Umum PP Pengadaan No.90/2010 dan 7 dan PP No.21/2004 2.2.2 Penyusunan 7 Rencana Umum Pengadaan dan hubungannya dengan PP No.58/2005 2.3 7 Tahapan Kegiatan Penyusunan Rencana Umum Pengadaan Barang/Jasa 11 2.3.1 Identifikasi Kebutuhan Barang/Jasa 11 2.3.2 Penyusunan dan Penetapan Rencana Penganggaran 17 2.3.3 Penetapan Kebijakan Umum Tentang Pemaketan Pekerjaan 18 2.3.4 Penetapan Kebijakan Umum Tentang Cara Pengadaan Barang/Jasa 2.3.5 Penetapan 19 Kebijakan Umum Tentang 22 Pengorganisasian Pengadaan 2.3.6 Penyusunan Kerangka Acuan Kerja (KAK) 22 2.3.7 Penyusunan Jadwal Kegiatan Pengadaan 23 2.3.8 Pengumuman Rencana Umum Pengadaan 24 Barang/Jasa BAB III PROSEDUR PERSIAPAN PELAKSANAAN PENGADAAN BARANG/JASA 25 3.1 25 Persiapan Pelaksanaan Pengadaan Swakelola 3.1.1 Pelaksanaan Swakelola oleh K/L/D/I Penanggung jawab Anggaran 3.1.2 25 Pelaksanaan Swakelola oleh Instansi Pemerintah Lain Pelaksana Swakelola 3.1.3 29 Pelaksanaan Swakelola oleh Kelompok Masyarakat Pelaksana Swakelola 3.2 Persiapan Pelaksanaan Pengadaan 34 Melalui Penyedia 38 Barang/Jasa 3.2.1 Perencanaan Pemilihan Penyedia Barang/Jasa 38 3.2.2 Pemilihan Sistem Pengadaan Barang/Jasa 38 3.2.3 Penetapan Metode Penilaian Kualifikasi Penyedia Barang/Jasa 3.2.4 42 Penyusunan Jadwal Pelaksanaan Pemilihan Penyedia Barang/Jasa 44 3.2.5 Penyusunan Dokumen Pengadaan Barang/Jasa 44 3.2.6 Penetapan Harga Perkiraan Sendiri (HPS) 47 BAB IV PEMANTAUAN DAN EVALUASI PERENCANAAN PENGADAAN BARANG/JASA 4.1 Maksud Dan Tujuan 53 4.2 Ruang Lingkup 53 4.3 Prosedur Pemantauan dan Evaluasi 54 4.3.1 Pemantauan 54 4.3.2 Evaluasi dan Pelaporan 54 4.3.3 BAB V 53 Pembinaan 54 PENUTUP 55 LAMPIRAN-LAMPIRAN 1. Lampiran (2 – 1) Bagan Alir Proses Penyusunan Rencana Kerja dan Anggaran Kementerian Negara/Lembaga (PP No.90/2010) 2. Lampiran (2 – 2) Bagan Alir Proses Penyusunan Rencana Kerja dan Anggaran Kementerian Negara/Lembaga (PP No.21/2004) 3. Lampiran (2 – 3) Bagan Alir Proses Penyusunan Rencana Kerja dan Anggaran SKPD (PP No.58/2005) 4. Lampiran (2 – 4) Contoh Format Daftar Pertanyaan Identifikasi Kebutuhan Barang K/L/D/I 5. Lampiran (2 – 5) Contoh Format Daftar Pertanyaan Identifikasi Kebutuhan Pekerjaan Konstruksi K/L/D/I 6. Lampiran (2 – 6) Contoh Format Daftar Pertanyaan Identifikasi Kebutuhan Jasa Konsultansi K/L/D/I 7. Lampiran (2 – 7) Contoh Format Daftar Pertanyaan Identifikasi Kebutuhan Jasa Lainnya K/L/D/I 8. Lampiran (2 – 8) Contoh Format Pengorganisasian Pengadaan 9. Lampiran (2 – 9) Contoh Format Kerangka Acuan Kerja Pengadaan Barang 10. Lampiran (2 – 10) Contoh Format Kerangka Acuan Kerja Pengadaan Pekerjaan Konstruksi 11. Lampiran (2 – 11) Contoh Format Kerangka Acuan Kerja untuk Pengadaan Jasa Konsultansi 12. Lampiran (2 – 12) Contoh Format Kerangka Acuan Kerja untuk Pengadaan Jasa Lainnya 13. Lampiran (2 – 13) Contoh Format Kerangka Acuan Kerja untuk Pengadaan Pekerjaan Swakelola 14. Lampiran (2 – 14) Contoh Format Jadwal Kegiatan Pengadaan Barang/Jasa 15. Lampiran (2 – 15) Contoh Format Rencana Umum Pengadaan Barang/Jasa 16. Lampiran (2 – 16) Contoh Format Pengumuman Rencana Umum Pengadaan Barang/Jasa

Pedoman umum perencanaan pengadaan barang/jasa

DAFTAR ISI BAB I KETENTUAN UMUM 1 1.1 Pendahuluan 1 1.2 Pengertian Istilah 1 1.3 Dasar Hukum 3 1.4 Maksud dan Tujuan 4 1.4.1 Maksud 4 1.4.2 Tujuan 4 1.5 Ruang Lingkup 1.5.1 4 Prosedur Penyusunan Rencana Umum Pengadaan Barang/Jasa 1.5.2 BAB II 4 Persiapan Pelaksanaan Pengadaan Barang/Jasa 5 PROSEDUR PENYUSUNAN RENCANA UMUM PENGADAAN BARANG/JASA 6 2.1 Penyusunan RKA-K/L/D/I 6 2.2 Penyusunan Rencana Umum Pengadaan dan hubungannya dengan Penyusunan Rencana Kerja dan Anggaran K/L/D/I 2.2.1 Penyusunan Rencana hubungannya dengan Umum PP Pengadaan No.90/2010 dan 7 dan PP No.21/2004 2.2.2 Penyusunan 7 Rencana Umum Pengadaan dan hubungannya dengan PP No.58/2005 2.3 7 Tahapan Kegiatan Penyusunan Rencana Umum Pengadaan Barang/Jasa 11 2.3.1 Identifikasi Kebutuhan Barang/Jasa 11 2.3.2 Penyusunan dan Penetapan Rencana Penganggaran 17 2.3.3 Penetapan Kebijakan Umum Tentang Pemaketan Pekerjaan 18 2.3.4 Penetapan Kebijakan Umum Tentang Cara Pengadaan Barang/Jasa 2.3.5 Penetapan 19 Kebijakan Umum Tentang 22 Pengorganisasian Pengadaan 2.3.6 Penyusunan Kerangka Acuan Kerja (KAK) 22 2.3.7 Penyusunan Jadwal Kegiatan Pengadaan 23 2.3.8 Pengumuman Rencana Umum Pengadaan 24 Barang/Jasa BAB III PROSEDUR PERSIAPAN PELAKSANAAN PENGADAAN BARANG/JASA 25 3.1 25 Persiapan Pelaksanaan Pengadaan Swakelola 3.1.1 Pelaksanaan Swakelola oleh K/L/D/I Penanggung jawab Anggaran 3.1.2 25 Pelaksanaan Swakelola oleh Instansi Pemerintah Lain Pelaksana Swakelola 3.1.3 29 Pelaksanaan Swakelola oleh Kelompok Masyarakat Pelaksana Swakelola 3.2 Persiapan Pelaksanaan Pengadaan 34 Melalui Penyedia 38 Barang/Jasa 3.2.1 Perencanaan Pemilihan Penyedia Barang/Jasa 38 3.2.2 Pemilihan Sistem Pengadaan Barang/Jasa 38 3.2.3 Penetapan Metode Penilaian Kualifikasi Penyedia Barang/Jasa 3.2.4 42 Penyusunan Jadwal Pelaksanaan Pemilihan Penyedia Barang/Jasa 44 3.2.5 Penyusunan Dokumen Pengadaan Barang/Jasa 44 3.2.6 Penetapan Harga Perkiraan Sendiri (HPS) 47 BAB IV PEMANTAUAN DAN EVALUASI PERENCANAAN PENGADAAN BARANG/JASA 4.1 Maksud Dan Tujuan 53 4.2 Ruang Lingkup 53 4.3 Prosedur Pemantauan dan Evaluasi 54 4.3.1 Pemantauan 54 4.3.2 Evaluasi dan Pelaporan 54 4.3.3 BAB V 53 Pembinaan 54 PENUTUP 55 LAMPIRAN-LAMPIRAN 1. Lampiran (2 – 1) Bagan Alir Proses Penyusunan Rencana Kerja dan Anggaran Kementerian Negara/Lembaga (PP No.90/2010) 2. Lampiran (2 – 2) Bagan Alir Proses Penyusunan Rencana Kerja dan Anggaran Kementerian Negara/Lembaga (PP No.21/2004) 3. Lampiran (2 – 3) Bagan Alir Proses Penyusunan Rencana Kerja dan Anggaran SKPD (PP No.58/2005) 4. Lampiran (2 – 4) Contoh Format Daftar Pertanyaan Identifikasi Kebutuhan Barang K/L/D/I 5. Lampiran (2 – 5) Contoh Format Daftar Pertanyaan Identifikasi Kebutuhan Pekerjaan Konstruksi K/L/D/I 6. Lampiran (2 – 6) Contoh Format Daftar Pertanyaan Identifikasi Kebutuhan Jasa Konsultansi K/L/D/I 7. Lampiran (2 – 7) Contoh Format Daftar Pertanyaan Identifikasi Kebutuhan Jasa Lainnya K/L/D/I 8. Lampiran (2 – 8) Contoh Format Pengorganisasian Pengadaan 9. Lampiran (2 – 9) Contoh Format Kerangka Acuan Kerja Pengadaan Barang 10. Lampiran (2 – 10) Contoh Format Kerangka Acuan Kerja Pengadaan Pekerjaan Konstruksi 11. Lampiran (2 – 11) Contoh Format Kerangka Acuan Kerja untuk Pengadaan Jasa Konsultansi 12. Lampiran (2 – 12) Contoh Format Kerangka Acuan Kerja untuk Pengadaan Jasa Lainnya 13. Lampiran (2 – 13) Contoh Format Kerangka Acuan Kerja untuk Pengadaan Pekerjaan Swakelola 14. Lampiran (2 – 14) Contoh Format Jadwal Kegiatan Pengadaan Barang/Jasa 15. Lampiran (2 – 15) Contoh Format Rencana Umum Pengadaan Barang/Jasa 16. Lampiran (2 – 16) Contoh Format Pengumuman Rencana Umum Pengadaan Barang/Jasa 17. Lampiran (3 – 1) Contoh Format Harga Perkiraan Sendiri (HPS) untuk Pengadaan Barang 18. Lampiran (3 – 2) Contoh Format Harga Perkiraan Sendiri (HPS) untuk Pengadaan Pekerjaan Konstruksi 19. Lampiran (3 – 3) Contoh Format Harga Perkiraan Sendiri (HPS) untuk Pengadaan Jasa Konsultansi 20. Lampiran (3 – 4) Contoh Format Harga Perkiraan Sendiri (HPS) untuk Pengadaan Jasa Lainnya 21. Lampiran (3 – 5) Contoh Format Rencana Anggaran Biaya Pekerjaan Swakelola 22. Lampiran (3 – 6) Contoh Format Naskah Kesepakatan Kerja Sama Pengadaan Swakelola 23. Lampiran (4 – 1) Contoh Format Daftar Simak Pemantauan dan Evaluasi Perencanaan Pengadaan DAFTAR PUSTAKA

Download Standard Pipe Support Catalog (PDF, 33 MB) - Piping ...

Due to unanticipated changes in the operating conditions of a piping system, periodic inspection and regular maintenance is necessary to prevent unforeseen shutdowns and to optimize production. During each inspection process, PT&P’s Field Service Team can: • Thoroughly inspect the pipe support/expansion joint system. • Perform design audits. • Record digital images of existing problems. • Provide a detailed written assessment for preliminary findings and recommendations. • Perform stress analyses to verify design. • Assist in drawing regeneration or updates. On-Site Installation & Maintenance Guidance With expertise in the installation and maintenance of various pipe support and expansion joint systems, PT&P’s Field Service Team is readily available to provide the following services: • Guidance in the installation, maintenance, removal, or repair of any pipe support or expansion joint system. • On-site consultations / training sessions. • Quick maintenance service during shutdowns / turnarounds. • Mobile trailer for drag testing, lock-up velocity testing, and bleed rate testing of hydraulic snubbers. For more comprehensive assistance, PT&P’s Field Service Team is trained to perform installation and repair on-site. 24 x 7 Emergency Services PT&P is available on a 24x7 basis to fulfill any emergency or quick-turn requirements. With a large inventory of stock components for pipe supports and expansion joints, PT&P can quickly assemble and ship products for any situation. For a quick response, please complete the emergency service request form at Pipingtech.com/emergency. PT&P’s Field Service Team GUARANTEES a response to your request within 30 minutes. www.pipingtech.com/emergency

Taylor Boiler and Equipment Company- Service

Round the clock repair with OEM parts means peace of mind for all Parker, QuikWater, Reimers, and Custom Care Water Technologies customer

Portland's Rug Cleaning and Repair Experts

Renaissance is a family owned specialty workshop dedicated to traditional hand washing and restoration of oriental rugs and related textiles . Owned by Randy and Valerie Hyde, who met while working in the trade for several well known rug cleaning, retail, and wholesale companies in Portland. They each have more than 20 years experience in cleaning and repairing oriental rugs and textiles. 

Electricians West Palm Beach

Choose AlphaTEC and choose electricians who always work to the highest possible standard in Electrician West Palm Beach FL, Electricians West Palm Beach, Emergency Electrical Repair and Home Electrical Panel FL.

NISSAN ROGUE S & SL, 2WD & AWD 13185 - Curt Manufacturing

GROSS LOAD CAPACITY WHEN USED AS A WEIGHT CARRYING HITCH: 3,500 LBS. TRAILER WEIGHT & 350 LBS. TONGUE WEIGHT. GROSS LOAD CAPACITY WHEN USED AS A WEIGHT DISTRIBUTION HITCH: 4,000 LBS. TRAILER WEIGHT & 400 LBS. TONGUE WEIGHT ***DO NOT EXCEED VEHICLE MANUFACTURER'S RECOMMENDED TOWING CAPACITY.*** HAVING INSTALLATION QUESTIONS? CALL TECHNICAL SUPPORT AT 1-800-798-0813 Parts List ITEM QTY PART NUMBER DESCRIPTION 1 6 M12-1.25 x 35mm HEX BOLT 2 6 1/2" CONICAL TOOTHED WASHER TOOLS REQUIRED 3/8" DRIVE RACHET 3/8" DRIVE 8" EXTENTION 3/8" DRIVE TORQUE WRENCH 8mm - 3/8" DRIVE SOCKET 18mm - 3/8" DRIVE SOCKET 19mm - 3/8" DRIVE SOCKET PASSENGER SIDE FRAME RAIL 2 DRIVER SIDE FRAME RAIL 1 EXISTING WELDNUTS (BOTH FRAME RAILS) HITCH WEIGHT: 31 LBS. INSTALL TIME PROFESSIONAL: 45 MINUTES NOVICE (DIY): 90 MINUTES INSTALL NOTES: - REMOVE TIE DOWN - LOWER EXHAUST - NO DRILLING INSTALLATION STEPS 1) Remove tow hook from the passenger side frame rail (5 bolts) and return to customer. 2) Remove small screw from heat shield on the passenger side frame rail and return to customer. 3) Lower exhaust for ease of installation. 4) Raise hitch into position and secure with hex bolts and conical washers as shown in the diagram above. 5) Torque all 12mm fasteners to 86 LB-FT. 6) Re-install exhaust removed in step 3. PERIODICALLY CHECK THIS RECEIVER HITCH TO ENSURE THAT ALL FASTENERS ARE TIGHT AND THAT ALL STRUCTURAL COMPONENTS ARE SOUND. Curt Manufacturing Inc., warrants this product to be free of defects in material and/or workmanship at the time of retail purchase by the original purchaser. If the product is found to be defective, Curt Manufacturing Inc., may repair or replace the product, at their option, when the product is returned, prepaid, with proof of purchase. Alteration to, misuse of, or improper installation of...

 67891011121314