SEARCH

Found 7358 related files. Current in page 1

army matv technical manual

BENZ Inc. Introduces New Products At The 2014 IWF Tradeshow

1888 PressRelease - Benz Inc. announces their new HF103 Solidfix® Spindle Motor, which enables users to change tools quickly using adapters that hold a variety of tools rather than using an expensive automatic tool changer or a labor-intensive manual tool. BENZ will have the HF103 Solidfix Spindle Motor on display at this years IWF tradeshow.

BYS9063_Form 2359 Tube Replacement.indd - Bryan Boilers

Tube Replacement Instructions: CL/CLM & HECL/HECLM Models Bryan Steam, the originator and leader in the production of flexible tube water and steam boilers for over 90 years, is pleased to provide you with the technical and service information you need to keep your Bryan Boiler running. These instructions will give you the information you need to remove and replace tubes on a CL/CLM or HECL/HECLM Model Bryan Boiler. Here are a few points to consider when inspecting your boiler. 1. Inspect your boiler annually to find and replace bad tubes. 2. These are the two warning signs that a tube is bad: • A knocking sound in the tube bank of the boiler indicates a possibly clogged tube. • A white ash visible along the bottom of a tube or tubes indicates that the tube is getting too hot from reduced water flow. Required Tools for Tube Replacement: 1" tube puller 1" tube driver 50/50 mixture pipe dope and cutting oil 1" paint brush 3 lb. hammer 9/16" socket wrench half round file full round file piece of emery cloth a tool to bend the tube studs (or small socket/ratchet set) ...

Download - Radical Performance Engines
by nkono 0 Comments favorite 3 Viewed Download 0 Times

The latest 3.4 litre version of the Powertec RP V8 Doubled up Tom Sharp investigates a cost effective V8 racing engine on behalf of Powertec. It essentially consists of a pair of Hayabusa engines, arranged at a 72° bank angle, driving a common crankshaft and mounted to a dedicated dry-sumped crankcase. The result is a P keenly priced V8 engine that is very light, powerful and reliable. The having initially a 2.6 litre displacement, it had been commissioned by been joined by three other varieties (see Table 1), which demonstrates Radical Motorsport for installation into that company’s SR8 sports-racing just how much flexibility is in the base package. The numbers tell the car. Radical specialised in motorcycle-engined sports-racers and was story of commercial success well enough. Powertec have to date built keen to augment its popular four cylinder machines with a V8. a total of 110 RP engines (including 75 RPAs and 25 RPBs); volumes owertec Engineering’s innovative, Suzuki Hayabusa-based engine is now owned, manufactured and built by Powertec Engineering RP V8 engine was introduced in the UK at the Autosport from its base in Peterborough, England. Run by former motorbike International show back in January 2005 since when it engine tuning specialist Ted Hurrell, Powertec employs 14 people in a has been a resounding technical and commercial success. 3000 sq ft factory. Founded upon a pair of 1.3 litre Hayabusa I4 motorcycle engines and The RP was designed and detailed by Steve Prentice of SPD Ltd 68 The original 2.6 litre RPA and the subsequent 2.8 litre RPB have now which any bespoke engine manufacturers would be proud of. However, DOSSIER : POWERTEC RP V8 ENGINE RP V8 CAD image governs UK motorsport – they banned it on the grounds of it not being derived from a passenger-carrying vehicle. Horne’s solicitors eventually ensured the car received its required log book but the MSA made it clear that the RP was not welcome in rallying. Powertec’s original product portfolio plan had included a 2.0 litre ‘screamer’ version, but as Ted Hurrell explains customer demand drove the capacity in the opposite direction. “The screamer was originally conceived for use in 2.0 litre hillclimb and VdeV sportscar racing, however the VdeV regulations quickly changed to insist upon four cylinder car engines and our hillclimb customers went in the direction of the unlimited classes, which means increasing swept volume as far as possible to maximize torque. So only one 2.0 litre engine was built before that variant was then unfortunately the RP series only represents 20% of Powertec’s business; the majority revolves around building and tuning the Suzuki Hayabusa four cylinder shelved. “Those two examples, of the 2.5 and 2.0 litre engines go to engines for markets such as motorbike racing, low volume production...

Click4Support Tech Support Services - A Wide Scope of Computer Solutions

Click4Support is one of the best and leading Tech support service provider. It provides a best computing online service related to browser support, printer support, Hardware & Software support, installation support, email support and all kinds of technical queries? It also provides 24*7*365 “online” technical support in anywhere and anytime. You can take help from them by dialing their toll free number 1-877-836-8352

MacBook Air User's Guide (Manual) - Support - Apple

Congratulations, you and your MacBook Air were made for each other. Built-in iSight camera Video chat with up to three friends anywhere in the world at the same time. www.apple.com/macbookair Mac Help isight Finder Browse the contents of your computer using Cover Flow. Time Machine Automatically back up your files to an extra hard drive. www.apple.com/macosx www.apple.com/macosx Mac Help Mac Help finder time machine iMovie Collect all your video in one library. Create and share movies in minutes. iPhoto Organize all your photos with Events. Publish to a Web Gallery with a click. www.apple.com/ilife/imovie www.apple.com/ilife/iphoto iMovie Help iPhoto Help movie GarageBand Create music by adding musicians to a virtual stage. Enhance your song to sound like a pro. www.apple.com/ilife/garageband GarageBand Help record photo iWeb Create beautiful websites with photos, movies, blogs, podcasts, and dynamic web widgets. www.apple.com/ilife/iweb iWeb Help website Contents Chapter 1: Ready, Set Up, Go 8 9 10 15 16 19 22 Welcome What’s in the Box Setting Up Your MacBook Air Setting Up DVD or CD Sharing Migrating Information to Your MacBook Air Getting Additional Information onto Your MacBook Air Putting Your MacBook Air to Sleep or Shutting It Down Chapter 2: Life with Your MacBook Air 26 28 30 32 34 35 Basic Features of Your MacBook Air Keyboard Features of Your MacBook Air Ports on Your MacBook Air Using the Trackpad and Keyboard Running Your MacBook Air on Battery Power Getting Answers Chapter 3: Problem, Meet Solution 40 Problems That Prevent You from Using Your MacBook Air 44 Using Apple Hardware Test Contents

Apple Price List - Managed Services - New York City Department of ...

NYCDOE, we’re here to help. If you need a little help finding information about Apple products, or if you want to ask about how to get the most out of your Mac, iPad, or iPod, you have a personal team ready to support you. Pre-Sales Questions Delivery and Integration Technical Support General product and pricing inquiries: To check order status: For server and software support: Bob Johnson robertjohnson@apple.com (631) 252-4530 Ashley Loftin SSONYCDOE@apple.com (800) 800-2775, ext. 42691 Tim Brennan tbrennan@apple.com (646) 725-3586 David Nash nash@apple.com (917) 297-5706 To schedule an onsite training or server configuration: For hardware support: Caroline Bruner cbruner@apple.com (800) 800-2775, ext. 42822 Jill Kaufman jkaufman@apple.com (212) 571-1313 Todd Grunow tg@apple.com (718) 935-5639 Allison Salmon asalmon@apple.com (800)800-2775. ext, 42815 Technical systems inquiries: Keith Binder kbinder@apple.com (201)887-6974 NYCDOE Resources: • • • Apple NYCDOE Price List for in your school: FAMIS Portal for DOE-approved Apple item numbers: https://dfoforms.nycenet.edu/FamisPortal/login.aspx Apple Education Licensing Program for the Mac Software Collection MacBook Air 11-inch MacBook Air 13-inch 1.3GHz dual-core Intel Core i5 1.3GHz dual-core Intel Core i5 4GB 1600MHz LPDDR3 memory 4GB 1600MHz LPDDR3 memory 128GB flash storage 256GB flash storage 128GB flash storage 256GB flash storage Intel HD Graphics 5000 Intel HD Graphics 5000 Apple USB SuperDrive (sold separately) Apple USB SuperDrive (sold separately) Built-in lithium-polymer battery Built-in lithium-polymer battery Up to 9 hours of wireless web Up to 12 hours of wireless web One Thunderbolt port, two USB 3 ports One Thunderbolt port, two USB 3 ports, one SDXC card slot 802.11ac Wi-Fi wireless networking; IEEE 802.11a/b/g/n compatible 802.11ac Wi-Fi wireless networking; IEEE 802.11a/b/g/n compatible Bluetooth 4.0 Bluetooth 4.0 Apple USB Ethernet Adapter (sold separately) Apple USB Ethernet Adapter (sold separately) 720p Face Time HD Camera 720p Face Time HD Camera

Associate Director Metro North Regional Employment Board Basic ...

Metro North Regional Employment Board Basic Function Provide overall professional support to the Executive Director and members of the Metro North Regional Employment Board; work with the Executive Director, Board of Directors, and REB members to develop and foster relationships with key stakeholders and to implement REB policies, programs, and initiatives. Assist in the development and implementation of the Metro North strategic plan. Conduct data analysis, research, and evaluation as needed to support workforce development efforts in priority industries. Develop service plans and budgets to ensure successful grant performance. Act as a technical resource to workforce partners and other staff as needed. Assist in or lead efforts to identify and build career pathway tools corresponding to priority industries. Opportunity for growth within the organization for candidate with the right mix of skills and experience. Specific Duties 1. Assist in the development of industry sector partnership groups based on priority industries as identified in the strategic plan; engage partner organizations (employers, training providers/community colleges, career centers, community-based organizations) in these groups; prepare materials, facilitate meetings and provide staff support to industry groups, including preparing meeting summaries. 2. With other REB staff, identify key workforce development issues and opportunities, and research creative approaches/best practices within workforce development nationally, but also across disciplines, with a goal of potentially testing and implementing innovative solutions to workforce development problems. 3. Conduct supporting research, develop and write grant proposals in response to state and federal Requests for Proposals/SGAs; identify and apply for foundation grants to support REB initiatives/industry partnership activities. 4. Develop programmatic plans and budgets to support grant submissions; implement, manage, and track program and budgetary performance of successful submissions. 5. Work closely and effectively with funding sources and with Metro North employers, ...

FINAL Deep Dive Report (S10-140310-003)[1] - Federal Railroad ...

On May 17, 2013, in Bridgeport, Connecticut, an accident occurred on Metro-North’s New Haven Line, when an eastbound Metro-North train of 8 cars, traveling 74 mph, derailed and came to rest on an adjacent track. Approximately 20 seconds later, a westbound Metro-North train on that adjacent track struck the derailed train. As a result of the accident, more than 50 people, some seriously injured, were hospitalized, rail operations were suspended, and millions in property damage occurred. • On May 28, 2013, a second accident occurred when a Metro-North train in West Haven, Connecticut, that was traveling 70 mph, struck and killed a Metro-North maintenance-ofway (MOW) employee who was part of a roadway work group performing railroad maintenance on a construction project. • On July 18, 2013, a third accident occurred when a CSX Transportation freight train derailed while traveling over Metro-North’s system. No one was injured, but property damage was significant. • On December 1, 2013, the fourth accident occurred when a Metro-North train of 7 cars traveling south from Poughkeepsie, New York, to Grand Central Terminal in New York City, derailed as it approached the Spuyten Duyvil Station. All cars derailed and the front cab came to rest close to the Harlem River. Four passengers were killed, and more than 70 were injured. Rail operations were suspended, and millions of dollars in property damage alone was sustained. On December 3, 2013, 2 days after the fourth and most serious of these accidents, FRA sent a letter to MTA expressing support for Governor Andrew Cuomo’s directive that MTA hold a safety stand-down, and directing Metro-North to implement a Confidential Close Call Reporting System (C3RS) (Appendix 2). Additionally, FRA issued Emergency Order 29 and Safety Advisory 2013-08. • Emergency Order 29, issued on December 6, 2013, required Metro-North to take immediate action to prevent excessive train speeds by identifying and prioritizing highrisk areas, modifying its existing signal system to ensure speed limits are obeyed, and 1 requiring a higher level of engagement and communication among operating crewmembers in areas in which major speed restrictions are in place. • Safety Advisory 2013-08, issued on December 10, 2013, urged railroads to provide additional training, increase the frequency of operational testing, and reinforced the importance of communication between crew members. The purpose was to ensure that all railroads adhere to Federal regulations and railroad operating rules regarding maximum authorized train speed limits. On December 16, 2013, FRA launched Operation Deep Dive, an assessment of Metro-North’s operations and safety compliance. More than 60 technical and human factor experts comprising 14 teams, conducted a 60-day comprehensive safety assessment of Metro-North. With assistance from the Federal Transit Administration, these experts reviewed and assessed Metro-North’s safety-related processes and procedures, its compliance with safety regulations and requirements, and its overall safety culture. In assessing Metro-North, the Deep Dive team evaluated:...

Climate Change 2014: Impacts, Adaptation, and Vulnerability ... - IPCC

ASSESSING AND MANAGING THE RISKS OF CLIMATE CHANGE Human interference with the climate system is occurring,1 and climate change poses risks for human and natural systems (Figure SPM.1). The assessment of impacts, adaptation, and vulnerability in the Working Group II contribution to the IPCC’s Fifth Assessment Report (WGII AR5) evaluates how patterns of risks and potential benefits are shifting due to climate change. It considers how impacts and risks related to climate change can be reduced and managed through adaptation and mitigation. The report assesses needs, options, opportunities, constraints, resilience, limits, and other aspects associated with adaptation. Climate change involves complex interactions and changing likelihoods of diverse impacts. A focus on risk, which is new in this report, supports decision-making in the context of climate change, and complements other elements of the report. People and societies may perceive or rank risks and potential benefits differently, given diverse values and goals. Compared to past WGII reports, the WGII AR5 assesses a substantially larger knowledge base of relevant scientific, technical, and socioeconomic literature. Increased literature has facilitated comprehensive assessment across a broader set of topics and sectors, with expanded coverage of human systems, adaptation, and the ocean. See Background Box SPM.1.2 Section A of this summary characterizes observed impacts, vulnerability and exposure, and adaptive responses to date. Section B examines future risks and potential benefits. Section C considers principles for effective adaptation and the broader interactions among adaptation, mitigation, and sustainable development. Background Box SPM.2 defines central concepts, and Background Box SPM.3 introduces terms used to convey the degree of certainty in key findings. Chapter references in brackets and in footnotes indicate support for findings, figures, and tables. Figure SPM.1: Illustration of the core concepts of the WGII AR5. Risk of climate-related impacts results from the interaction of climate-related hazards (including hazardou...

User manual ACER ASPIRE 5315 - mypdfmanuals.com

You can read the recommendations in the user guide, the technical guide or the installation guide for ACER ASPIRE 5315. You'll find the answers to all your questions on the ACER ASPIRE 5315 in the user manual (information, specifications, safety advice, size, accessories, etc.). Detailed instructions for use are in the User's Guide. User manual ACER ASPIRE 5315 User guide ACER ASPIRE 5315 Operating instructions ACER ASPIRE 5315 Instructions for use ACER ASPIRE 5315 Instruction manual ACER ASPIRE 5315 Your user manual ACER ASPIRE 5315 http://mypdfmanuals.com/dref/1115241 Manual abstract: Never spill liquid of any kind onto or into the product. To avoid damage of internal components and to prevent battery leakage, do not place the product on a vibrating surface. Never use it under sporting, exercising, or any vibrating environment which will probably cause unexpected short current or damage rotor devices, HDD, Optical drive, and even exposure risk from lithium battery pack. · · · Using electrical power · This product should be operated from the type of power indicated on the marking label. If you are not sure of the type of power available, consult your dealer or local power company. Do not allow anything to rest on the power cord. Do not locate this product where people will walk on the cord. If an extension cord is used with this product, make sure that the total ampere rating of the equipment plugged into the extension cord does not exceed the extension cord ampere rating. Also, make sure that the total rating of all products plugged into the wall outlet does not exceed the fuse rating. Do not overload a power outlet, strip or receptacle by plugging in too many devices. The overall system load must not exceed 80% of the branch circuit rating. If power strips are used, the load should not exceed 80% of the power strip's input rating. This product's AC adapter is equipped with a three-wire grounded plug. The plug only fits in a grounded power outlet. Make sure the power outlet is properly grounded before inserting the AC adapter plug. Do not insert the plug into a non-grounded power outlet. Contact your electrician for details. · · · · Warning! The grounding pin is a safety feature. Using a power outlet that is not properly grounded may result in electric shock and/or injury.

« previous  123456789