SEARCH

Found 7083 related files. Current in page 1

2006 ford explorer How to install a Throttle Position Sensor

FLEXIBLE HOSE DATA SHEET_1 - EasyFlex

FLEXIBLE HOSE DATA SHEET EASYFLEX Flexible Sprinkler Drops are designed to significantly reduce labor and installation costs. By eliminating the need for pipe cutting and midline connections, you save valuable time and money. EASYFLEX Flexible Sprinkler Drops can be installed on almost any suspended commercial ceilings. The flexible hose allows for fast installation while our innovative brackets are simple and easy to install. Brackets for T-Bar ceiling grids, wall mount, metal studs, woodbeams, open hat channels, industrial ducts, and cleanrooms. No special tools required, and installation completed in a few easy steps. Flexible hoses come in braided or unbraided types, from 24” to 72” in length. EASYFLEX Flexible Sprinkler Drops Appliance Standards National Fire Protection Association (NFPA): - NFPA 13: Standard for the Installation of Sprinkler Systems - NFPA 13D: Standard for the Installation of Sprinkler Systems in One and Two-Family Dwellings and Manufactured Homes - NFPA 13R: Standard for Installation of Sprinkler Systems in residential Occupancies up to and including four stories in height American Society for Testing and Methods (ASTM): - ASTM C635: Standards specifications for the manufacture, performance, and testing of metal suspension systems for acoustical tile and lay-in panel ceilings...

Suzuki Hayabusa 2000 - 2005
by nkono 0 Comments favorite 3 Viewed Download 0 Times

Suzuki Hayabusa 2000 - 2005 Engine Protection Cage installation instructions Items included in this kit Cage loop (1each) Side struts (2 each) Extended frame sliders (2 each) Hardware kit (1 each) (contents listed below) M10-1.25 x 70mm bolt (1 each) M10-1.25 x 80mm bolt (1 each) ¼”-20 x 1 ½” bolts (2 each) ¼”-20 x 2” bolts (2 each) ¼”-20 lock nuts (4 each) 3/8”-24 x ¾” bolts (2 each) Flange Bushings (2 each) M10-1.5 x 15 1/2" all thread rod (1 each) M10-1.5 hex nuts (2 each) 1. Follow installation instructions for extended frame sliders. (See page 1) Note: Do not attach delron tips or tighten extended frame sliders until all components are installed. 2. Place the cage loop inside short telescoping tubes on sliders (See fig. G), push the ¼”-20 x 1 ½” bolts through the bolt holes in the telescoping tubes from the outside and start the ¼”-20 lock nuts. Do not tighten lock nuts at this time. 3. Install the left side strut using the all thread rod, flange bushings and hex nuts provided. Slide the following components over one end of the all thread rod in this order: flange bushing marked with "L", side strut marked with "L" and one M10-1.5 hex nut. (See fig A) Slide the all thread rod through the swing arm bolt on the left side of the motorcycle. (make sure the flange bushing slides into the swing arm bolt) On the right side of the motorcycle slide the following components over the all thread rod in this order: flange bushing marked "R", side strut marked "R" and M10-1.5 hex nut. (you may need to hold the left side to ensure it stays in place) 4. Push the bottom of the cage loop towards the rear of the motorcycle while pulling the bottom of the left side strut towards the front until the bolt hole on the side strut meets the threaded hole on the tab welded to the cage loop. Attach the side strut to the outside of the tab on the cage loop with a 3/8”-24 x ¾” bolt. (See fig J) Do not tighten the bolt at this time. Repeat for other side. 5. Once all components are attached tighten all bolts and nuts. Be sure to torque all engine mount bolts to factory specifications. Torque the hex nuts on the all thread stud to 12ft lbs. We recommend using "blue" loctite on the all thread stud to ensure the hex nuts do not vibrate loose. 6. Install delron tips with ¼”-20 x 2” bolts and ¼”-20 lock nuts.

Full System Instructions - Two Brothers Racing

Installation Instructions 1. Make sure the bike is completely cool before starting the installation. Make sure the bike is secure on a centerstand or ideally a service lift. 2. Remove rear lower cowling. 3. Remove OEM mufflers. V.A.L.E. TM 2008 Suzuki V a r i a b l e A x i s L o c k i n g E x h a u s t HAYABUSA V.A.L.E.™ Complete Exhaust System with M-2 Canister Part # 005-1930106V / 005-1930107V / 005-1930108V 8. 9. 4. The horn should also be removed for more radiator clearance. Install the TBR head pipes. (Each piece is labeled for proper postioning). From Left to Right, install head pipes 1, 2, 3, and then 4. Use the OEM gasket between the head pipes and cylinder head. Remove cowling from both the left and right sides. “M” Parts List Qty. Description 1 15” Muffler Canister 1 4-2-1 Slip-on Tube 1 4-2-1 Header Assembly 1 HARDWARE KIT 1 8x55mm Socket Head Flat Bolt (Black) 6 80mm Springs 1 8x16mm Flange Bolt 4 6x14mm Socket Head Cap Screw 1 Barrel Clamp 1 5mm Long Handle Ball End Hex Wrench 4 6mm Split Lock Washer 2 TBR Script Logo Yellow Decal 4” “1” Muffler Slip-tube Part Number Varies 005-19301S 005-19301HK 005-193-3C 005-SHF855B 005-S-80 005-FB816 005-SH814 005-27-66MSH 005-9-18610 005-WL6 015-10208-A 5. “2” “3” “R” “4” Remove radiator braces. 6. “L ” Remove O2 sensore from OEM head pipe. 10. Install the collectors to the bottom of the head pipes. The collectors are labeled “L for left and “R” for Right. ” IMPORTANT - PLEASE READ CAREFULLY We recommend that this performance part be installed by a qualified motorcycle technician. If you have any doubts as to your ability to install this performance part, please consult with your local motorcycle dealer. Read all instructions first before starting installation. Make sure the motorcycle and exhaust system are completely cool before starting the installation. Also, make sure the bike is secure on a centerstand or ideally a service lift during installation. Be sure to save all stock components for possible use later.

2009 Hayabusa - PCV - MPS Racing
by nkono 0 Comments favorite 4 Viewed Download 0 Times

Parts List Power Commander USB Cable CD-ROM Installation Guide Power Commander Decals Dynojet Decals Velcro® Strip Alcohol Swab Wire tap O2 eliminator The ignition MUST be turned OFF before installation! YOU CAN ALSO DOWNLOAD THE POWER COMMANDER SOFTWARE AND LATEST MAPS FROM OUR WEB SITE AT: WWW.POWERCOMMANDER.COM PLEASE READ ALL DIRECTIONS BEFORE STARTING INSTALLATION 2191 Mendenhall Drive 20-008 www.powercommander.com North Las Vegas, NV 89081 (800) 992-4993 www.powercommander.com 2009 Suzuki Hayabusa PCV - 1 POWER COMMANDER V INPUT ACCESSORY GUIDE A C C E S S O RY I N P U T S Map - The PCV has the ability to hold 2 different base maps. You can switch on the fly between these two base maps when you hook up a switch to the MAP inputs. You can use any open/close type switch. The polarity of the wires is not important. When using the Autotune kit one position will hold a base map and the other position will let you activate the learning mode. When the switch is “CLOSED” Autotune will be activated. Shifter- These inputs are for use with the Dynojet quickshifter. Insert the wires from the Dynojet quickshifter into the SHIFTER inputs. The polarity of the wires is not important. Speed- If your application has a speed sensor then you can tap into the signal side of the sensor and run a wire into this input. This will allow you to calculate gear position in the Control Center Software. Once gear position is setup you can alter your map based on gear position and setup gear dependent kill times when using a quickshifter. USB CONNECTION CRANK ANALOG EXPANSION PORTS 1 & 2 Optional Accessories such as Color LCD unit or Auto tune kit.

RCC Turbos - Stage 1 Turbo Install - Suzuki Hayabusa - Gen 1

RCC Turbos - Stage 1 Turbo Install: Suzuki Hayabusa (Gen 1) • Preparation/Disassembly: Remove the seat. Disconnect negative terminal on the battery. Drain the fuel tank. Remove the fuel tank. Remove the stock fuel pump from the tank. Remove the air box. Remove the MAP sensor and temperature sensor from the air box. Remove left and right side fairings. Drain engine oil. Drain engine coolant. Remove the oil filter Remove the oil restrictor, behind the filter. Remove the oil cooler lines. Remove the radiator and oil cooler, as one unit, leaving only the bracket/support for radiator (before reinstalling the radiator please remove all the tabs along the bottom of the radiator). Remove the entire exhaust system. Remove the PAIR system. Remove the oil pan from the engine. • Sensor Bracket Modification: On the left hand side of bike, on the inside of the frame, you will see a bracket, with a plastic vacuum canister, vacuum control solenoid valve, atmospheric pressure sensor, and some vacuum lines, with a check valve in the vacuum line. Please remove this entire bracket, eliminate all the vacuum lines, the plastic canister, and the control solenoid valve, and also cut off the metal tab that held the vacuum canister. Then reinstall this bracket with only the atmospheric pressure sensor, and plug the wires back in. • Tap/plug PAIR System Holes: Tap the four small PAIR system holes, above the exhaust ports, with an M6 x 1.0 tap. Install the four small M6 screws into the exhaust holes after tapping them. • Modify the Oil Pan: Drill a ¾” hole on the left side of the oil pan. Use thread sealant on the washer, and red Loctite on the threads. Make sure the sealing washer is against the inside of pan, then the stainless flat washer, then the nut. Once the fitting is installed, reinstall the oil pan. • Install Header/Turbo/Oil Lines/Exhaust: Install the header and turbo as a unit, but with the bolts loose. Use four of your original header bolts on the top of the turbo header (Allen head). Use the four new bolts on the bottom row of the header (M8, 10mm flange head). PLEASE NOTE! After installing the dump pipes and waste gate, the nipple on the top of the waste gate remains open, and no hose gets installed on the top fitting. The top fitting is used for boost control on Stage 2 and higher end kits. It is not used on Stage 1 kits.

Sample Resumes by Type - Career Center - Illinois State University

Sample Resumes by Type Table of Contents Sample Resumes by Type 2-15 Sample Resume Outline 2 Sample Resume - General 3 Alumni 4 College of Applied Science & Technology 5 College of Arts & Sciences 6 College of Business 7 College of Education 8 College of Fine Arts 9 Curriculum Vitae 10-11 Graduate Student 12 Mennonite College of Nursing 13 Skills-Based 14 Veteran 15 Sample Resume Outline NAME Address Phone Email OBJECTIVE (optional) Your objective statement should be brief and tailored to the position you are applying for. It can also briefly highlight the skills you can offer the organization. EDUCATION Institution Name, City, State Degree Title and Major(s)/Minor(s) Graduation Date Cumulative/Major GPA: ??/4.0 (Month, Year) Academic Honors: List any honors Related Coursework: List any courses that highlight unique skills or knowledge Previous Institution Name, City, State (if applicable) Degree Date RELATED EXPERIENCE Job Title Date(s) Organization, City, State • Describe responsibilities and skills obtained in order of importance • Start each bullet point with an action verb, then add skills and abilities developed while performing the task Job Title Date(s) Organization, City, State • Quantify experiences when possible • Focus on key skills and qualifications highlighted in a job description and match your bullet points to those listed OTHER HEADINGS (additional experiences categorized into appropriate sections) Job Title/Position Date(s) Organization, City, State • Continue listing appropriate bullet points for experiences and skills gained COMMUNITY SERVICE Organization, City, State Date(s) CERTIFICATIONS AND PROFESSIONAL MEMBERSHIPS Certification/Professional Association, Organization, City, State Date(s) SKILLS Proficient/knowledgeable in ____ Experience working with ____ (Use margin and font size adjustments, spacing, and headings to get your resume to one full page. Margins should be between .5” and 1”. Font size should be between 10-12 point, except for the header and section headings, which should be in larger font.)

resumes & cover letters - Office of Career Services - Harvard University

OCS RESUMES & COVER LETTERS Undergraduate Resource Series Office of Career Services | 54 Dunster Street Harvard University | Faculty of Arts and Sciences | 617.495.2595 www.ocs.fas.harvard.edu © 2013 President and Fellows of Harvard College All rights reserved. No part of this publication may be reproduced in any way without the express written permission of the Harvard University Faculty of Arts & Sciences Office of Career Services. 08/13 Office of Career Services Harvard University Faculty of Arts & Sciences Cambridge, MA 02138 Phone: (617) 495-2595 www.ocs.fas.harvard.edu RESUMES A ND COVER LE TTE R S Create a Strong Resume A resume is a brief, informative summary of your abilities, education, and experience. It should highlight your strongest assets and skills, and differentiate you from other candidates seeking similar positions. Although it alone will not get you a job or internship, a good resume is an important element toward obtaining an interview. Tailor your resume to the type of position you are seeking. This does not mean that all of your work history must relate directly, but your resume should reflect the kind of skills the employer would value. Find additional guidance on resumes and cover letters , as well as resume samples, on the OCS website....

Sample Resume - US Forest Service
by Deppony 0 Comments favorite 1 Viewed Download 0 Times

NAME Address City, State, & Zip Code Phone Number Email Address OBJECTIVE To obtain a position in Fire or Trail management with the U.S. Forest Service. EDUCATION Chico State University, Chico, California Major: Biological Sciences, GPA Currently 3.0 Minor: Chicano Latino Studies Expected Graduation Date: May 2011 Reedley Community College, Reedley, California Major: Biological Sciences GPA 3.27 Graduated December 2009 Reedley High School, Reedley, California GPA 3.12 Graduated June 2007 WORK EXPERIENCE Field Labor Enterprises, Chico, California June 15, 2010 – Present Laborer, 30 hours/week - $6.75/hour • Skilled in the use of tractors, chain saws, pruning shears and shovels • Picking peaches, plums, nectarines, grapes, tomatoes, oranges • Packing fruit in boxes in an organized manner • Pruning & thinning various types of fruit trees • Rolling and boxing of raisins Supervisor: Phone #: Starbucks, Fresno, California August 23, 2008 – May 1, 2010 Barista and cashier, 30 hours/week - $6.75/hour • Memorized and prepared numerous specialty drinks while meeting corporate standards and customer special requests • Processed precise transactions for customers • Monitored the store to ensure it was fully stocked with all necessary supplies and products • Communicated effectively with co-workers and customers to provide the best customer service possible Supervisor: Phone #: Darlene Farms, Calistoga, California April 6, 2007 – July 2, 2008 Almond Orchard Manager, 35 hours/week - $7.25/hour • Maintained 800 acres of almond trees by managing irrigation, mowing and spraying herbicides • Operated various types of tractors such as caterpillars and backhoes Supervisor: Phone #: Valley View Country Club, Sonoma, California May 8, 2006 – March 7, 2007 Irrigation Manager, 15 hours/week - $5.00/hour • Supervised 15-20 irrigators throughout the 18-hole golf course • Replaced sprinkler heads, broken pipes, mowers and tractors • Monitored the electronic sprinkler system • Operated greens mowers, fairway mowers and sand trap tractors Phone #: Supervisor: VOLUNTEER EXPERIENCE (OPTIONAL) U.S. Forest Service, Sacramento, California Aug 5, 2007 – September 3, 2007 Generation Green Leadership Camp – Total 80 hours • Instructed visitors on fire prevention • Advised the public on various topics in relation to fire safety, wildlife biology, and laws and regulations within the USDA Forest Service • Supervised the children’s activity area and maintaining a professional work environment • Participated in public speaking and other career development workshops Phone #:

Resume Samples - Boston University
by Deppony 0 Comments favorite 1 Viewed Download 0 Times

Boston University College of Communication Career Services Résumé Samples 640 Commonwealth Avenue • Boston, MA 02215 • 617/353-3490 • comjobs@bu.edu www.bu.edu/com-csc E-mailable Fonts: Times, Times New Roman Font Size: Type name in 20 – 24 and all other text should be 10, 11, or 12 point depending on the amount of text Margin Settings: Go to Format, select Document, and set Top and Bottom at 0.5 or 0.6, Left and Right should be 0.7 or 0.8 To set a line below name and address, go to left align, then select Auto Shapes and select lines, clicking on the straight line. Insert line under name and address. Once line is in place you may enhance the line by selecting “More Lines” to the far right of Auto Shapes. To delect settings for your format., drag left indent/hanging indent/first line indent to 1 1/4 inches. Drag first line indent back to 0. Set two left tabs, 1/4 inch apart, to the right of left indent/hanging in dent. Change tab by clicking twice to right tab. Insert one right tab at 6 3/4 inches. Bullets are made by selecting “option*. SAMPLE RESUME #1 – Basic Format Your Name Street Address • City, State, Zip • Telephone number • E-mail (Centered) List two Addresses if you need both Present and Permanent Address ( Centered) OBJECTIVE Seeking a full-time position in Advertising/Marketing – or Seeking an internship in Television Production EDUCATION Boston University College of Communication Boston, MA Bachelor of Science in (Communication, Journalism, or Film and Television) Expected May 2003 Concentration in (Advertising or Public Relations, or Film Production, etc.) Dean’s List Liberal Arts Concentration (or Minor if you have one) in English Current GPA: 3.6/4.0 London Internship Programme (or other study abroad) Studies in …………….. London, England September – December 2002 Related Course Work (Add left tabs at 4 1/4 and 4 1/2) • Course Name • Course Name • Course Name • Course Name RELATED EXPERIENCE Name of Company Title • Information about what you did and accomplished • Start each phrase with action words • If job is current use present tense - If job is over use past tense Name of Company (Don’t forget academic experience such as AdLab) Title • What you did for company or client • More information about what you did Prior Title (if you have held two different positions at the same company) City, State Dates

Savage Gulf Trail Map - Friends of South Cumberland State ...

GREETER TRAIL General Description: This short trail connects the Alum Gap Camp Area with the Greeter Falls Area. The first mile is an easy plateau top walk with the last half mile a moderate gorge walk. The falls are sometimes dry but there is always a cool water hole at the bottom. Miles Trail Description: 0.0 Trail begins at Alum Gap, 1 mile down Big Creek Gulf Trail from camping area. Big Bluff Overlook to left. 0.2 1.0 Suspension Bridge across Boardtree Creek, junction of Greeter Falls Loop Trail. 1.3 Trail splits—left is Lower Falls (50’ high) and plunge pool; right is Upper Falls (15’ high) Greeter Falls. 1.4 General Description: This long, difficult trail is designed to accommodate extended trips. Half the length is the Collins River Gorge and the other half is along the east rim. The gorge section has many beautiful geological features. Trail is closed during part of winter due to dangerous ice buildup at 6.3. Miles Trail Description: Trail begins atop Peak Mountain at the end of the South Rim Trail and the Stage 0.0 Road Historic Trail. 0.5 Blue Branch Overlook to the right, an outstanding view of a short tributary gorge and the main gulf. Ford of Blue Branch; thick Rhododendron growth. 1.1 Horsepound Point Overlook to right. 1.8 2.4 Standing Rock Overlook to right. 2.6 Collins River Overlook to right. 3.0 A small stream is forded with the remains of an old moonshine still visible to the left. Another still site to the left on a larger stream. 4.7 4.9 Collins East Camp Area to left. 5.3 Collins River is crossed on a 100’ suspension bridge, above huge boulders. 6.2 Collins West Camp Area on trail straight ahead; main trail to right. Camp area is on the mountaintop and has the best overlook along the trail—Rocky Point. There is also a parking area from 55th AVE off HWY 108, 1/4th mile out access trail from campsite. 6.3 The spectacular triple waterfall of Rocky Mountain Creek, a huge overhang, and creek ford. A large mound of fallen rocks and exceptionally large Chestnut Oak Tree to trail 6.8 right; start of descent.....

« previous  123456789